2.3 Adding Base Reference Execution ID

Use this configuration to assign an execution ID for a process, model, or RRF run that was executed on the selected reference date in production.

Note:

Execution IDs are generated for models; however, Run ID (RunSkey) is not generated. Therefore, when mapping models, the Run ID is set to 0.
  1. Login to STSA.
    The Workspace Summary page is displayed.
  2. In the Workspace Summary, Sandbox tab, launch the required workspace.
  3. Click the Context Menu representing the user name and then click Configuration Manager.
  4. Click Configure in the Base Reference Execution ID tile.
    The Base Reference Execution ID page is displayed.
  5. Select Create New.
    The Execution details page is displayed.
  6. Select a base production run date from the Reference Date field.
    Reference date is the date corresponding to the process executed date in the production.
  7. Select a process, model, or RRF run from the Name drop-down list.
    The Process ID and Type fields are are auto-populated.
  8. For models, leave the Execution ID as 0. For processes and RRF runs, select the appropriate Execution ID from the list.
  9. Click Add against the row to save this entry.
  10. Click Save to save your changes.