6.7.2 Cloning or Creating Project from Existing Project

When you clone an existing project, the system retains the original project’s flow—including whether it started with a scenario or an analysis configuration. You can modify this flow after cloning if required.

Note:

Referenced scenarios or analysis configurations in the original project are not automatically linked in the cloned project.

You can choose to reference different objects or reconfigure the flow when editing the cloned project.

Variables will auto-populate based on the referenced object, and validations are applied to ensure consistency.

To create a new project from an existing project:

  1. Login to STSA.
  2. In the Workspace Summary, Sandbox tab, select the required workspace.
  3. Click Project.
    The project summary page is displayed.
  4. To replicate and modify an existing project with minor changes, select an existing project, click More Actions and then click Copy.
  5. Provide a name, update the description, review the selections made and click Save.
    The project summary page is displayed.
  6. Review the selected analysis configuration and project or select new configuration and project or create new configuration and project.
    For more information about creating an analysis configuration, see the Creating Analysis Configuration section.

    For more information about creating a project, see the Creating a Project section.

  7. Submit the project for review and approval process.
    For more information about sending objects for review and approval, see the Workflow for STSA Objects section.
  8. After the project is approved, add the run parameters by clicking the Add Run Parameters (if required), else make one of the existing run parameters as the latest and then run the project.