6.7.2 Cloning or Creating Project from Existing Project
When you clone an existing project, the system retains the original project’s flow—including whether it started with a scenario or an analysis configuration. You can modify this flow after cloning if required.
Note:
Referenced scenarios or analysis configurations in the original project are not automatically linked in the cloned project.
You can choose to reference different objects or reconfigure the flow when editing the cloned project.
Variables will auto-populate based on the referenced object, and validations are applied to ensure consistency.
To create a new project from an existing project: