Importing Pipelines
Administrators are responsible for uploading pre-configured pipelines once during initial setup.
This is a mandatory step. You must upload these pipelines to the environment
as part of the initial setup, using the Import Pipelines feature.
- Navigate to the Applications landing page.
- Click the Navigation Menu to access the Navigation List. The Navigation List displays the list of modules.
- Click Pipeline Administration. The Administration page is displayed.
- Follow these steps:
- (Mandatory) Import metadata
- Click Import Metadata. The metadata is imported and a confirmation message is displayed.
- Import all ready-to-use pipelines
- Select Import All Pipelines in the Import Pipelines pane. By default, the Import All Pipelines check box is selected.
- Click Import. All the ready-to-use pipelines are imported.
- Import selected pipelines:
- Enter the required version of the pipeline to import in the Versions drop-down list. The latest version displays by default.
- Select the required pipelines to import from the Pipelines drop-down list.
- Click Import. The selected pipelines are imported.
Note:
If you attempt to upload a pipeline which has already been imported, an error message will display.
- (Mandatory) Import metadata