Scheduling an ETL Load Plan (ODI Only)

To schedule a Load Plan, perform the following tasks:

  1. In the ODI Studio, navigate to the Load Plans and Scenarios section in the Operator tab.
  2. Expand the Load Plan that you wish to schedule.
  3. Right-click on the Scheduling tree node and select New Scheduling.
  4. Enter the required details and click Save.
  5. Restart the associated Physical Agent with the Load Plan (default value: PA_AN).