Schedule an Incremental ETL

The AM.zip file contains pre-configured ETL scheduling in Inactive mode.

The Incremental ETL is used to load the delta data. You can execute an Incremental ETL either by executing Load Plan LP_INC_AM, or scheduling an ETL to run at the configured time interval.

To schedule a Load Plan, execute the following steps:

  1. In the Designer tab, navigate to Load Plans and Scenarios section and expand LP_INC_AM (Load Plan for Incremental ETL).
  2. Right-click Scheduling and select New Scheduling.

    The Load Plan Scheduling dialog box appears.

    Load Plan Scheduling dialog box

    You can set options given in the Status and Execution sections, according to the requirements to schedule the Load Plan.