Removed E2B PDP job, Bulk Transmit E2B and Bulk Transmit Fax processes

  • E2B PDP job:

    As the batch generation process handles E2B reports, the following has been removed:

    • PDP job for E2B report generation.
    • The Configuration screen in the AG Service configuration tool to configure DB load timings.
    • The System Resource Usage button.
  • Bulk Transmit E2B process:

    When the E2B report was transmitted from the bulk reporting screen, the Bulk Transmit E2B background process marked the E2B report for transmission to be picked-up by the Interchange service.

    Now, when you transmit the report from the Bulk Reporting screen, the report is marked for transmission . In addition, the background reports generation happens only through the Batch Report Generation and Batch Report Generation Worker processes. Hence, the Bulk Transmit E2B process is no longer required and has been removed.

  • Bulk Transmit Fax process:

    When the fax report was transmitted from the Bulk Reporting screen, the Bulk Transmit Fax background process marked the fax reports for transmission to be picked-up by the Fax process.

    Now, when you transmit the report from the Bulk Reporting screen, the report is marked for transmission. In addition, the background reports generation happens only through the Batch Report Generation and Batch Report Generation Worker processes. Hence, the Bulk Transmit Fax process is no longer required and has been removed.

Note:

You may want to delete Bulk Transmit E2B and Bulk Transmit Fax processes in the Oracle Argus Safety Service user interface, letting these process running will cause extra system resource usage and will not process any work.