Field Descriptions

The following table describes the fields associated with this section.

Field or Control Name Description

Title

This is the unique name for the batch report name.

Report

Enables you to select a report that has to be scheduled.

  • Report Regeneration
  • Memorized report

Product

Enables you to select a product for which the report is generated.

Frequency: Every Days.

Enables you to enter the number of days after which the report is to be generated. The value has to be greater than 0.

Next Run Date

Enables you to enter the next date from which the report has to be scheduled.

Advanced Condition

Enables you to select the Advance Condition that satisfies the criteria which will trigger the Signal. You can either select an existing criteria or create a new one.

Report Type

Enables you to select the type of the report.

Group

Enables you to select the group to which the report must be assigned.

Use the following procedure to configure Batch Reports

  1. Click the Report Title (or row), to view the details associated with that report. The details appear in the Modify Batch Report section.

    Use the Batch Reports Filter to make your search specific to a batch report. The filtering criterion is essential as it helps you to search for specific items.

  2. Select the appropriate Field as the filtering criteria from the drop-down list.
  3. Once you have selected the Field, you can specify whether your search should contain or start with specific alphabets.
  4. Enter the search criteria in Value
  5. Click Filter to apply the selected criteria.
  6. This displays the search results under Total Number of Rows.

    Tip:

    You can alternatively click Add New to create a new report.

    • Use Copy to make an editable copy of an existing report.
    • Use Delete to delete an existing report.
  7. Enter the Title Name for the batch report.
  8. Select the Report Type from the drop-down list.
  9. Select the Group to which the report must be assigned.
  10. Select the report to be scheduled as Memorized Reports or Reports Regeneration.
  11. Select the Frequency of generating the report after the specified number of days have elapsed.
  12. Select the Product for which the report is to generated, from the drop-down list box.
  13. Select the Report from the drop-down list.
  14. Enter the Next Run Date. This is the next date from which the report has to be scheduled.
  15. Select the Advanced Condition associated with the report configuration.
  16. Click Select icon to launch the Advanced Conditions browser.
  17. Click Save to save the changes made to this section.