Lock an in-place revision object

  1. At the bottom of the Project Explorer, click the Visit Schedule (Visit Schedule button) button.
  2. At the top of the Project Explorer, select Study Design, and select the IPR Summary tab.
  3. In the grid, highlight the in-place revision that you want to lock, and at the top of the IPR Summary tab, select Lock and Protect, and select Lock.