Introduction of Cost Model Versioning from 5.3+
Oracle ClearTrial plans calculate level of effort, costs, distributions, and timelines logic, default values, and a work breakdown structure referred to as a “cost model." A new cost model is created with every ClearTrial release and will now be referred to using the release version number. For example, upon release of 5.4, the cost model will be called “cost model 5.4." Oracle ClearTrial will now support multiple cost models simultaneously.
All cost models from 5.3 and forward will be preserved and available for use in plans.