Work Breakdown Structure (WBS) Update
This update includes various updates to the ClearTrial-defined WBS. In summary, the following updates are included in the ClearTrial 5.7 Cost Model.
-
Introduction of the Lead CRA resource.
-
Updated Major Tasks, Tasks, and Resources.
-
Updates to defaults for ClearTrial-defined assumptions and level of effort calculations.
-
New units of measure and cost drivers.
-
A new 5-task structure for all site visit algorithms including Pre-study Site Visit (PSSV), Site Initiation Visit (SIV), Interim Monitoring Visit (IMV), and Site Close-out Visit (COV).
The following ClearTrial-defined Major Tasks and Tasks have been added or renamed in the 5.7 cost model:
Table 3-1 Added or Renamed Major Tasks
| 5.6 Major Task Name | 5.7 Major Task Name |
|---|---|
|
Site Audited |
Quality Assurance - Site Audit |
|
Pre-study Site Visit (PSSV) |
Pre-study Site Visit |
|
Pre-study Site Visit (PSSV) by Phone |
Pre-study Site Visit by Phone |
|
One Hour of Phone-based Monitoring |
Phone-based Monitoring Visit |
|
Onsite Monitoring Visit - Prep, Travel, Reporting, and Follow-up |
Onsite Monitoring Visit - Non-SDV Activity |
Table 3-2 Updated Tasks, by Major Task
| 5.6 Task Name | 5.7 Task Name |
|---|---|
|
Pre-study Site Visit |
Pre-study Site Visit |
|
(None) |
Pre-study site visit - Trip Report Review |
|
Pre-study Site Visit by Phone |
Pre-study Site Visit by Phone |
|
(None) |
Complete phone-based pre-study site visit Trip Report Review |
|
Site Initiation Visit |
Site Initiation Visit |
|
(None) |
Site initiation visit - Trip Report Review |
|
Site Initiation Visit by Phone |
Site Initiation Visit by Phone |
|
(None) |
Complete phone-based site initiation visit Trip Report Review |
|
Onsite Monitoring Visit - Prep, Travel, Reporting, and Follow-up |
Onsite Monitoring Visit - Non-SDV Activity |
|
(None) |
Onsite monitoring visit - Trip Report Review |
|
(None) |
Onsite monitoring visit - Perform other onsite activities |
|
One Hour of Phone-based Monitoring |
Phone-based Monitoring Visit |
|
Perform phone-based monitoring visit |
Complete phone-based interim monitoring visit |
|
(None) |
Complete phone-based interim monitoring visit - Trip Report Review |
|
Separate Drug Accountability Visit |
Separate Drug Accountability Visit |
|
(None) |
Prepare for separate drug accountability visit |
|
(None) |
Travel to site to perform separate drug accountability visit |
|
(None) |
Follow-up for separate drug accountability visit |
|
Site Audited |
Quality Assurance - Site Audit |
|
|
|
Site Close-out Visit |
Site Close-out Visit |
|
|
|
Site Close-out Visit by Phone |
Site Close-out Visit by Phone |
|
Conduct final site visit (via phone) |
Conduct final site close-out visit (via phone) |
|
(None) |
Conduct final site close-out visit (via phone) Trip Report Review |
WARNING:
Before upgrading or copying any plan from a prior cost model, please make sure you have not created any custom Tasks or Major Tasks with the same name as those included in the 5.7 Cost Model. If you have, please remove or rename these prior to upgrading or copying those plans.
Updates to Units of Measure and Cost Drivers
-
The unit for the Phone-based Monitoring Visit major task has changed from Hours to Phone IMV.
-
The following new units of measure or cost drivers are available to leverage when defining custom algorithms:
-
Month
-
Day
-
Phone PSSV
-
Phone SIV
-
Phone IMV
-
Phone COV
-
Updates to Resources
-
Existing QA01 - Compliance / QA Manager has been updated to QA01 - Quality Assurance Manager
-
Existing QA02 - Compliance / QA Auditor has been updated to QA02 - Quality Assurance Auditor
-
New CR09 - Lead CRA resource is included by default on all new visit-specific trip report review Tasks.
New Paradigm for Site Visit Labor
The Major Tasks listed below have been updated to use a 5-task pattern for the various activities performed for each visit. This includes preparation, travel, reporting/follow-up, onsite time and trip report review activities included by default under each type of site visit Major Task.
Parent topic: Clinical Intelligence Update