Previous Topic

Next Topic

Book Contents

Resupply configuration described

The purpose of the IRT resupply features is to automate the ordering of drug units to:

IRT uses a both a projection and buffer resupply strategy for automated supply ordering. You can switch between these strategies when you create a new resupply strategy:

Note: If Buffer Resupply is selected, Trigger Weeks and Resupply Weeks are assumed to be zero. When Trigger Weeks and Resupply Weeks are set to zero, the minimum and maximum buffer quantities act as a simple trigger and resupply without any prediction on subject visits.

The supply ordering algorithm runs according to the frequency set up during study design:

IRT verifies that the selected minimum buffer quantity is always present at the site:

When generating a trial supply order, the IRT system selects from the earliest expiring lot and picks drug units in ascending sequence number (for serialized drugs).

To protect the blind of the study, if only one drug unit if required to be shipped in a blinded study, IRT can be configured to randomly select an additional drug unit and order them together.

Send Feedback