Create a new Draft study version
Create a new Draft study version anytime you need to update your study's design.
Note:
To move a study version from Draft to Testing, Training, or Production, you must be assigned the following study roles and permissions:- The Study Designer study template role (or a custom study design study role) assigned in Study Design mode;
- The Study Manager study template role (or a custom study management study role) that must have the Move a Study Design to Testing or Production permission included in the study role. This study role must be assigned in the mode where you want to move the new study version: Testing, Training, or Production.
The new Draft version is a copy of the latest version of the study. The latest version of the study has the highest fourth number (for instance, 4 in 1.0.0.4). When you create a new Draft version of a study, this number increases by 1. For example, 1.0.0.1 becomes 1.0.0.2.
Related Topics
Parent topic: Manage study versions during the study conduct period