Study version and rollover study FAQs (for study designers)
- Can I work on and test two versions of a study at the same time?
At any given time in a study, you can design one version, and you can test one version. - I need to update my Production study because of a revision or protocol amendment. What do I do?
Create a new version of the study. The new version is identical to the latest study version. - Can I have multiple versions of a study in production?
Yes. - How many different study versions can I have for a study?
As many as you need, though you can configure the study only in the Draft version. Additionally, you can have only one study version in Draft at a time and only one study version in Testing at a time. - How do I know which is the latest version of a study?
The latest study version has the highest number in the last position (for example, 4 in 1.0.0.4). - What is my workflow for designing a rollover study?
Your workflow for designing a rollover study is almost the same as the one for designing any other study in Oracle Clinical One Platform, with one important mention: a rollover study shouldn't contain a screening visit. Subjects enrolled in a rollover study are already screened in the original study, so you can't screen them again in the rollover study.
Parent topic: Frequently Asked Questions (FAQs)