PreviousNext
JavaScript must be enabled to correctly display this content
Schedule Clinical One Data loads in
Production
After you select a study, click the Study Configuration icon from the navigation bar. Then click the Clinical Data Model
tab.
Select Production from the Lifecycle drop-down at the top of the
page.
Click Clinical One Configuration.
Click the Suspend icon.
Install the model if it has not already been installed in Production.
Select Production under Study Lifecycle in the table below.
Select the Schedule Production Data Load checkbox to ensure that your
frequency and start time settings get scheduled.
In the Frequency in Minutes field, enter the number of minutes between
automatic data loads. (Data loads do not start until the previous one
completes.)
In the Start Time with 24-hour Clock field, enter the
hour and minutes in hh:mm format.
Note:
To ensure the data loads at
the correct start time, do not enter a time too close to the current local
time. To allow background processes to run, make sure that the time entered
is a minimum of ten minutes into the future. If you enter a time that
expires before the data load starts, the data cannot load until the
specified time on the next day.
Click Save.
Click the Resume icon. The first scheduled data load starts at the
specified start time. If you did not enter a start time, it starts
immediately.