Submissions
| Description | Ticket | Severity |
|---|---|---|
| If your organization’s account didn't have the “Enable Pending IRB/EC type to trigger site workflows” option enabled, you were still able to select “P – IRB/EC” in the IRB/EC drop-down on the site page and an error occurred. With this correction, you'll no longer see the “P – IRB/EC” in the drop-down when your organization hasn't enabled this option for the account. | CHK-50069 | 3 |
| When you planned an EU submission part 2 package and selected documents for a site, selecting another site without first deselecting the original site cleared your previous document selections and the count incorrectly reset to zero. | CHK-50389 | 3 |
| When you viewed a submission package, you could not adjust column widths in either the Documents in package section or the Documents included in section, which made it difficult to view longer content. With this correction, column widths can be adjusted as expected in both sections. | CHK-51072 | 4 |
| The date picker could not be dismissed when replanning the Initial Submit planned date in the Submission Dates section of the submission artifact drawer. Now, the date picker can be closed as expected without requiring a page refresh. | CHK-51398 | 4 |
| When you selected country documents or sites while compiling an EU Submission Part 2 package, the numbered step icons flickered and appeared unstable. We corrected this issue so the step 1 and 2 icons remain stable during selection, and they no longer flicker as you move through the workflow. | CHK-51421 | 3 |
| For a Submission/Package combination, if you completed the submit activity (linked to initial submission date) without entering baseline/planned dates, those fields incorrectly remained editable in the submission artifact drawer's submission dates section. Now, once the Actual Date is completed, the Baseline Date and Planned Date fields are disabled and can not be edited. | CHK-51442 | 3 |
| When you completed a Submission package activity, you could select a completion date earlier than the actual date of its predecessor activity. Now, you can only select dates that occur on or after the predecessor activity’s actual completion date. | CHK-51578 | 3 |
| In Bulk Work, the Item filter drop-down did not consistently display all available options across the Activities, Items, and Planning tabs; and study-level submissions could be missing if there were no study-level documents configured for discontinue. Now, all Item filter options are always available across tabs. When no data matches the selection, the table displays “No data to display.” | CHK-51673 | 3 |
Parent topic: Stability improvements