Exports
| Description | Ticket | Severity |
|---|---|---|
| If two exports start around the same time for the same item with minor updates, the first one is not cancelled as expected. | CHK-51113 | 3 |
| Study level package export logs and audits do not include study ID as expected. | CHK-51174 | 2 |