Distributed Energy Resource Management (DERMS)
Day Ahead Market Bidding
This feature helps utilities turn their available distributed energy resources (DERs) into a credible day-ahead market offer. Operators can understand how much flexibility is available, what it will cost, and how quickly it can respond. After market awards are received, the system creates an achievable operating plan for individual DERs, reducing the effort and risk of coordinating a portfolio manually.
Linking SCADA Points to DER Groups for DAGC and Market
This feature enables operators to associate analog and digital SCADA points with DER groups used for market and automated dispatch operations. Operators can search for, add, remove, and refresh group-level measurements, providing a consolidated view of DER-group telemetry and a foundation for monitored, automated DER control.
DERMS Optimization Event Management
This feature gives operators a practical way to plan, assess, and manage DERMS operational events. Operators are able to define what they need the DER fleet to accomplish, assess the expected impact before acting, and track the progress and results of each event. This makes DERMS operations more repeatable, auditable, and easier to manage during both routine and changing grid conditions.
Virtual Power Plant (VPP) Modeling and Look-Ahead Analysis
Utilities can model Edge Virtual Power Plants (eVPPs) at electrical branches and evaluate planned active- and reactive-power reductions before they are applied. Manual or externally supplied schedules can be included in Power Flow and FLM analyses, approved for real-time use, and assessed against nominal or as-switched network topology. Operators can view scheduled reductions, affected load, and feeder impacts throughout the network and FLM workflow.
Distribution Automatic Generation Control (DAGC) for Real-Time Market and Ancillary Grid Services
This feature helps utilities respond more quickly to real-time market opportunities and grid-service needs. When the required output from a DER group changes, the system can determine an achievable response and prepare the actions needed to deliver it. Operators can:
• Associate a Target MW SCADA point with a VPP group and enable automatic control.
• Trigger Unit Commitment from real-time Target MW updates.
• Automatically generate and execute DER dispatch steps through a DAGC Dispatch switching sheet.
• Use configurable deadband controls to prevent unnecessary repeated dispatches.
• View market awards, initial and latest Unit Commitment dispatches, and Target MW history.