Reviewing the Solution Summary
The Solution Summary provides the device-level values associated with the event. Use it to answer these questions before generating a manual sheet or when auditing an automatic job:
• Which devices and phases were included?
• Which values were calculated and which were operator-edited?
• Which devices were disabled, blocked, missing SCADA, or in error?
• Do the target setpoint, bandwidth, and low-limit values match the generated sheet?
• Does the count of executable rows match the expected switching blocks?
Note: The Messages and Solution Summary tabs provide complementary information. Messages shows activity throughout the EVR life cycle; Solution Summary shows the device solution used by the event.
Generating a Review Sheet from a Manual EVR Event
1. Open the manual EVR event and select the EVR Report.
2. Review Messages and Solution Summary.
3. Select Generate Sheet.
4. Open the associated EVR switching sheet.
5. Review every device block and value before locking or executing the sheet.
Generate Sheet creates or reuses a switching sheet for review and associates it with the event. It does not submit the sheet for execution. If a sheet already exists, use the message identifying the existing sheet to open and review that sheet instead of creating duplicate work.
Restoring Voltage and Handling Exceptions
Restoring Voltage After EVR
Restore steps can be included as scheduled blocks in the original scheduled sheet or generated later from the EVR switching sheet. Choose the restore source that matches the intended operating baseline.
 
Choice
Use When
Verify Before Execution
Return to Previous
Devices must return to the values associated with the pre-EVR operating state.
Confirm that the captured values are the intended restore targets.
Return to Nominal
Devices must return to Power Flow nominal values.
Confirm Power Flow availability and that nominal differs from any intentionally retained pre-EVR setting.
Generating Restore Steps from Switching
1. Open the EVR switching sheet.
2. Select the Steps tab.
3. Select Actions, then Generate Steps.
4. Select Return to Previous or Return to Nominal.
5. Review the appended device blocks, values, phases, and scheduled times.
6. Lock and execute the restore work in accordance with local procedures.
When restore work is appended to a completed EVR sheet, review the sheet state and the newly added steps before execution. Existing completed steps remain part of the audit trail.
Verifying Restoration
• Every intended device has a restore block.
• Restore values match the selected Pre-EVR or Nominal source.
• All active phases are represented correctly.
• All restore steps reach an expected terminal status.
• Current SCADA values confirm the restored settings.
• Follow-up work is planned in accordance with local procedures for any device that failed to restore or was only partially restored.
Handling Exceptions and Failures
When troubleshooting, review the row's Message / Reason value, the EVR Report, the Work Agenda DMS Status, the switching sheet and step statuses, and the current SCADA state together. Do not repeat a control request until the actual device state is known.
 
Condition
Operator Response
No eligible devices
Verify Zone / Region, Device Category, SCADA control availability, user access, and whether supported devices exist in the selected scope.
No SCADA Setpoint
Investigate SCADA availability and quality. Exclude the device when no usable source value can be established.
Blocked target
Review the reduction percentage and applicable low limit. Apply an override only when approved.
Error row
Read Message / Reason, correct the request or device condition, and rerun Analysis.
No executable rows
Resolve calculation statuses or change device participation before creating a job.
Values changed after Analysis
Rerun Analysis and repeat the pre-job review.
Control timeout or failed step
Verify whether the device changed in the field before retrying. Review the standard information on Switching and SCADA control failures. Retry behavior is site-configurable.
Partial execution
Identify completed operations and actual device settings. Prepare controlled correction or restoration for the remaining devices.
Execution stopped, canceled, or superseded
Confirm which steps have already completed. Do not assume that cancellation restored the previous values.
Restore failure
Verify actual settings, isolate failed devices, and complete a controlled recovery according to local procedures.
Existing event or sheet
Open the existing record and confirm its relationship to the solution before repeating Create Job or Generate Sheet.
 
Note: The command used to stop or abort DMS processing, the number of automatic retries, and the handling of network changes are implementation-dependent. Follow site procedures and the controls available in Work Agenda and Switching.
Menus, Fields, and Table Reference
Menus
File Menu
Menu Option
Description
New Window
Opens another EVR tool instance.
Print
Opens the available print workflow for the current tool view.
EVR Saved Solutions
Opens saved EVR cases.
Exit
Closes the tool.
Actions Menu
Menu Option
Description
Fetch Devices
Discovers eligible devices for the current request.
Analysis
Calculates targets and row statuses.
Create Job
Creates the EVR operational record and performs the configured Automatic or Manual workflow.
Save Case
Stores the working request and device solution as a saved case.
Field References
Request Field Reference
Field
Description
Zone / Region
Operating scope used for device discovery.
Voltage Reduction %
Enter a value greater than 0 and less than 100. EVR applies this percentage reduction to each eligible current setpoint.
Execution Mode
Automatic or Manual workflow selection.
Restore Mode
Pre-EVR or Nominal restore source.
Device Category
All, LTC, or REG.
Bandwidth Override
Enables a global target bandwidth value.
Global Bandwidth Override
Global bandwidth used when no device-specific edit is present.
Limit Override
Enables global low-limit override handling.
Global Low Limit Override
Global low limit used when no device-specific edit is present.
Schedule Window
Enables scheduled reduction and restore timing.
Start Date
Scheduled start time for reduction work.
End Date
Scheduled time for restore work when generated.
 
Table Reference
Device Review
Column
Description
Type
Device type, such as LTC or REG.
Zone
Zone or region associated with the device.
Device
Device name.
Auto Status
Current device automatic or control status.
Use
Includes or excludes the row from EVR.
Current Setpoint A/B/C
Current setpoint values from SCADA used in the calculation.
Nominal Setpoint A/B/C
Nominal values used for restoration in Nominal mode, when available.
Target Setpoint A/B/C
Calculated or operator-edited EVR targets.
Bandwidth A/B/C
Target bandwidth values.
Low Limit A/B/C
Target low-limit values.
Calc Status
Ready, Review, Disabled, Blocked, No SCADA Setpoint, or Error.
Message / Reason
Explanation of the row result or condition requiring attention.