Working with the DERMS Operating Reserve Tool
The Operating Reserve tool provides an overview of available load reduction capacity (operating reserve) that can be called upon during an emergency. It shows the forecast load impact of eligible active manual strategies whose strategy type is configured by the OP_RESERVE_STRATEGY parameter. The tool supports first-hour and full-event projections at hourly and 15-minute resolution, and allows operating reserve information to be exported.
Available Operating Reserve Strategies
The Operating Reserve Strategy drop-down list displays operating reserve strategies that currently exist in the system. Only the active manual strategies are displayed. User can select one strategy to view available load reduction capacity under that strategy.
Operating Reserve Table
The Operating Reserve table shows the forecast load impact available from the selected strategy. Each column represents a possible report start time, and each row represents a subsequent event, pre-event, or post-event period. Values are displayed in MW. Positive values represent available load reduction. Negative values represent load snap-back, or an increase in load.
Green cells identify event periods. Red cells identify post-event periods. A cell's color identifies its period type; it does not indicate whether the calculated value is positive or negative. Blank cells have no load impact for that period.
The toolbar provides the following controls:
• Refresh: Updates the operating reserve information from the server.
• Show Graph / Hide Graph: Shows or hides the load-impact graph. Hiding the graph provides more space for the table.
• Timeline / Compact: Selects the table layout. Timeline displays the report periods in chronological order. Compact displays the event and subsequent effects in a condensed layout. Full Event 15 Minute reports use Compact layout only.
• First Hour / All Event: Selects the report projection. First Hour shows the load impact from stages that begin during the first hour. All Event shows the load impact from all stages and their applicable pre-event, event, and post-event effects.
• 1 Hour / 15 Minute: Selects the report interval. 1 Hour displays hourly periods. 15 Minute displays 15-minute periods.
• Start Period / End Period: For a 15 Minute report, limits the displayed report range. Select times in 15-minute increments.
Operating Reserve Load Impact Graph
The graph shows the load impact in the first displayed interval for each report start time. The interval is one hour for 1 Hour reports and 15 minutes for 15 Minute reports. The graph uses the selected First Hour or All Event projection.
File Menu
• To export the currently selected operating reserve strategy, select File, and then select Export. You are prompted for the location where to save the file.
• To export all operating reserve strategies, select File, and then select Export All. Each strategy is saved to a separate file, and you are prompted for a location for each file.