Oracle GoldenGate Error Messages

OGG-00948

Lag for {0} {1} is {2} (checkpoint updated {3} ago)


Cause

The setting of the LAGINFO parameter prompted Manager to report lag information to the error log. This message is considered an informational message because the lag is not greater than the value specified with the LAGCRITICAL parameter.


Action

None