Details for Out-of-Sync Job
The Details for Out-of-Sync Job page contains all information about a finished comparison job that is finished with one or more out-of-sync compare pairs. When the page is initially displayed, a summary of the out-of-sync job and the list of out-of-sync Groups belonging to the out-of-sync Job are displayed. The out-of-sync Group items can be expanded to display the list of out-of-sync compare pairs. Each out-of-sync Compare pair item can be expanded to display the summary information and the list Out-of-Sync rows.
Element | Description |
---|---|
Job Details |
This section displays the number of items that were out-of-sync during the base comparison and the cumulative statistics on the repair operations applied to the base comparison. The following information are displayed for the out-of-sync job:
|
Repair Configuration Options |
Specify the options to repair the out-of-sync job. |
Database User Name |
This database user name can be used to override the repair user specified on the database connection for the target database. The user must have the required privileges to use the Repair feature. More |
Password |
The password for the specified database user name. This password is used for the duration of the repair operation. It is not stored by Veridata. |
Job Profile |
The profile can be overridden. See Selecting a Job Profile. |
Set Override Run Options... |
Set the repair settings here. See Repair Settings options. |
Click Run Repair after specifying the configuration options to repair the out-of-sync job.
Only authorized users with veridataRepairOperator
role can initiate repair jobs. More
If a repair job is running for the base comparison job, this page displays the current status for the running repair job and will periodically refresh itself. After one or more repair jobs have been run against a base comparison, this page displays the cumulative statistics for all of the repair jobs.
Related Topics
"Repairing Out-Of-Sync Jobs" in Oracle GoldenGate Veridata User's Guide