If Takeover Is Performed While Both Sites Are Up, Project Is Not Removed From the Original Primary Site (21684495)

Problem Summary: If you run the geopg takeover command when both the primary and secondary ZFSSA appliances are up, then switchover to the secondary site fails because of an empty project that exists on the original primary ZFSSA appliance after the protection group is activated.

Workaround: Before attempting to switchover the protection group, remove the empty project on the secondary appliance after the protection group is activated.