Receiving and Unpacking Requirements
When the server is unloaded at your site:
-
Leave the server in its shipping carton until it arrives at its installation location.
-
Use a separate area to remove the packaging material to reduce particle contamination before the server is taken to the data center.
-
Ensure that there is enough clearance and clear pathways to move the server from the unpacking area to the installation location.
-
Ensure that the entire access route to the installation location is free of raised-pattern flooring that causes vibration.