Install a Power Supply

Caution:

Always replace a failed power supply with a power supply of the same type (model).
  1. Remove the replacement power supply from its packaging and place it on an antistatic mat.
  2. Align the replacement power supply with the empty power supply slot [1].
  3. Slide the power supply into the bay until it is fully seated [2].

    You will hear an audible click when the power supply fully seats.


    Figure showing how to remove a power supply.
  4. Reconnect the power cord to the power supply.
  5. Verify that the amber Fault-Service Required LED on the replaced power supply and the Fault-Service Required LEDs on the front and back panels of the server are not lit.

    Note:

    After you have replaced Power Supply 0, you must reset the Oracle ILOM service processor (SP) to propagate the key identity properties (KIP) data to the new power supply. For instructions on resetting the SP, refer to the Oracle ILOM Administrator's Guide for Configuration and Maintenance Firmware Release 5.1.x at Servers Documentation Systems Management. Power Supply 1 does not contain KIP data, and therefore does not require an SP reset after replacement.
  6. If you disconnected the two CMA left-side connectors, reconnect the connectors.

    Refer to Install the Cable Management Arm (Optional) in Oracle Servers X9-2 and X9-2L Installation Guide