Oracle Exadata X9-2 Database Server Service Manual Returning the Server to Operation 20 Returning the Server to Operation After replacing components inside of the server, perform the procedures in the following sections: Server Filler Panel Requirements Remove and Install Filler Panels Install the Server Top Cover Remove Antistatic Measures Reinstall the Server Into the Rack Return the Server to the Normal Rack Position Reconnect Data Cables and Power Cords Power On the Server