- Oracle Exadata Storage Server X9-2 EF, HC, and XT Service Manual
- Servicing the Battery
- Install the Battery
Install the Battery
- Unpack the replacement battery.
-
Press the new battery into the battery retainer.
Note:
If disconnected during battery removal, reconnect the auxiliary signal cable to the disk backplane and the SAS cables to the Internal HBA. For more information, see Servicing the Disk Backplane and Servicing SAS Cables. -
Return the server to operation.
- Install the server top cover.
- Return the server to the normal rack position.
- Reconnect the power cords to the server power supplies, and power on the server.
-
Verify that the System OK LED indicator is lit.
Note:
If the service processor is configured to synchronize with a network time server using the Network Time Protocol (NTP), the Oracle ILOM SP clock will be reset as soon as the server is powered on and connected to the network; otherwise, proceed to the next step.
-
If the service processor is not configured to use NTP, you must do one of the
following:
-
Reset the Oracle ILOM SP clock using the Oracle ILOM CLI or the web interface.
Refer to the Oracle Integrated Lights Out Manager (ILOM) 5.1 documentation at Servers Documentation - Systems Management.
-
Use the BIOS Setup Utility to reprogram the host clock.
Refer to the Oracle X9 Series Servers Administration Guide at Oracle x86 Servers Administration, Diagnostics, and Applications Documentation.
-
Related Topic: