UDCs for Project Status Inquiry

The JD Edwards EnterpriseOne Job Cost system provides hard-coded values for the user-defined code (UDC) tables that project status inquiry uses. Verify that these UDC tables and values exist in your system:

  • 51/BA (Billing Amount)

  • 51/BF (Budget Flag)

  • 51/PS (PSI Sequence)

  • 51/CC (Category Codes)

  • 51/CN (Column Type)

  • 51/FF (Formula Factor)

  • 51/OP (Alert Operator)

  • 51/SM (Summarize)

  • 51/TM (Totaling Method)