Copying an Overhead Method within an Overhead Rule (Release 9.2 Update)

You can copy an overhead method within an overhead rule using the Overhead Rules program (P09J50).

To copy a method in an overhead rule:

  1. From the Joint Venture Management module (G09J), click Joint Venture Setup, and then Overhead Rules (P09J50).

  2. On the Work with Overhead Rules form, search and select the overhead rule in which you want to copy a method and then click OK.

  3. On the Edit Overhead Rule form, select the overhead method that you want to copy and then click Copy Method on the Row menu.

    The system creates a copy of the selected overhead method and displays it right below the overhead method from which it was copied.

  4. For the newly added method, update the following fields as needed. The system does not copy the following attributes of the overhead method:

    • Effective From

      By default., the system displays today's date.

    • Effective Through

    • Inactive

  5. Select the newly added overhead method in the list. The system displays the subform of the selected method. Update the information in the subform as needed.

  6. Click OK to save your changes.