Print Min-Max Planning Report

Use the Print Min-Max Planning Report scheduled process to maintain inventory levels for all your items or for selected items.

When to Use

The Print Min-Max Planning Report scheduled process determines the minimum and maximum order quantity and the quantity to replenish or reorder. The Reorder Quantity is used when min-max planning suggests a new purchase requisition, transfer order, movement request, or work order to replenish inventory levels for your organization. You can perform min-max planning at the inventory organization level or at the subinventory level.

Privileges Required

  • Print Min-Max Planning Report (INV_PRINT_MIN_MAX_PLANNING_REPORT_PRIV)

Specifications

Review the following before setting up this scheduled process:
Specification Description
Job Type Ad hoc job.

Scheduled.

Frequency Submit the Print Min-Max Planning Report scheduled process based on the frequency of your inventory replenishment. If inventory replenishment is done at regular intervals, it’s suggested to run this process using scheduled intervals. Running the process too frequently can result in performance and reliability issues. For example, running the process every 5 minutes isn’t recommended.
Time of Day Any time.
Duration Report runtime varies based on the number of items or subinventories selected for inclusion in the min-max planning report.
Compatibility Consider other scheduled processes that are being submitted at the same time. For example, resource intensive processes such as Transfer Transactions from Inventory Costing shouldn’t be submitted at the same time.

Parameters

Parameter Optional or Required Description Parameter Values Special Combinations Required Notes
Organization Required Select the organization for which to run the report. Inventory organization None N/A
Sort By Required Specify how you want the report output sorted. Item

Category

Buyer

Planner

None N/A
From Item Optional Enter the starting item for a range of items to restrict the report. Item None N/A
To Item Optional Enter the ending item for a range of items to restrict the report. Item None N/A
Planning Level Required Specify whether min-max planning will be performed for the entire organization or for a specific subinventory. Organization

Subinventory

None N/A
Item Selection Required Specify whether min-max planning will include only items under minimum quantity, only items over maximum quantity, or all min-max planned items. All min-max planned items

Items over maximum quantity

Items under minimum quantity

None N/A
Subinventory Optional Enter the subinventory for which you want to run the report. Subinventory None N/A
Batch Prefix Optional Enter the prefix for the batch. Batch prefix None N/A
Lot Control Optional Specify whether min-max planning will include lot-controlled items, items not lot controlled, or both. Include both lot and not lot controlled items

Include items not lot controlled

Include lot controlled items only

None N/A
Demand Cutoff Date Optional Enter the demand cutoff date. The report includes demand on or before this date. Date None N/A
Demand Cutoff Date Offset Optional Enter the demand cutoff date offset. The value that you enter is subtracted from the current date. For example, if you enter a value of 2 for the Demand Cutoff Date Offset, the application considers demand within the current day minus two days.

The Min-Max Planning report will run for demand between the value that you entered for the Demand Cutoff Date and the new date (current date minus offset).

Number of days None N/A
Supply Cutoff Date Optional Enter the supply cutoff date. The min-max planning calculation includes open supply orders on or before this date. Date None N/A
Supply Cutoff Date Offset Optional Enter the supply cutoff date offset. Number of days None N/A
Restock Required Enter Yes or No to indicate whether to generate the replenishment request. The default value is No. Yes

No

None N/A
Ship-to Location Optional Enter the ship-to location to be specified on any requisition records created during the Min-Max Planning process. Location None N/A
Net Unreserved Orders Required Enter Yes or No to include unreserved order quantity in min-max planning calculations. The default value is Yes. Yes

No

None N/A
Include Interface Supply Required Enter Yes or No to include interface supply as supply quantity. The default value is Yes. Yes

No

None N/A
Net Reserved Orders Required Enter Yes or No to specify whether to include reserved order quantity in min-max planning calculations. The default value is Yes. Yes

No

None N/A
Include Nonnettable Subinventories Optional Enter Yes or No to specify whether to include nonnettable subinventories. The default value is Yes. Yes

No

None N/A
Display Format Required Select the report format. The default value is Display all information. Display all information: The report displays all columns.

Do not display supply and demand details: The report doesn't display the Minimum Order Quantity, Maximum Order Quantity, and Multiple Order Quantity columns.

Do not display order constraints: The report doesn't display the On-Hand Quantity column.

None N/A
Display Item Description Required Enter Yes or No to indicate whether to display the item description. The default value is Yes. Yes

No

None N/A
Include PO Supply Required Enter Yes or No to indicate whether to include purchase order supply. The default value is Yes. Yes

No

None N/A
From Category Optional Enter the starting category for a range of categories to restrict the report. Category None N/A
To Category Optional Enter the ending category for a range of categories to restrict the report. Category None N/A
From Buyer Optional Enter the starting buyer for a range of buyers to restrict the report. Buyer None N/A
To Buyer Optional Enter the ending buyer for a range of buyers to restrict the report. Buyer None N/A
From Planner Optional Enter the starting planner for a range of planners to restrict the report. Planner None N/A
To Planner Optional Enter the ending planner for a range of planners to restrict the report. Planner None N/A
Purchase By Revision Optional Specify whether to issue purchase orders by item revision. The default value is No. Yes

No

None N/A
Include Movement Request Supply Required Specify whether movement request supply will be included in the min-max planning calculations. The default value is Yes. Yes

No

None N/A
Net WIP Demand Optional Specify whether to net WIP demand. The default value is Yes. Yes

No

None N/A
Include WIP Supply Optional Specify whether to include WIP supply. The default value is Yes. Yes

No

None N/A
Include Subinventories Without On-Hand Quantities Optional Enter Yes or No to indicate whether the min-max planning process creates replenishment movement requests when the source subinventory has zero item on-hand quantity. The default value is Yes.

When the value is set to No, the min-max planning process suppresses the creation of the replenishment movement request when the source subinventory has 0 item on-hand quantity.

Yes

No

None N/A

Troubleshooting Information

  • You can view the status of the process in the Scheduled Processes work area.
  • Set the Restock parameter to generate the report without submitting the replenishment request.
  • You can use the scheduled process request history log (file name will be in the format <RequestId>.log) to view the results of calculations for demand quantity, supply quantity, on-hand quantity, and reorder quantity in the request log.
  • When the process is submitted, you can Resubmit, Put on Hold, Cancel Process, and Release Process as provided by the Scheduled Processes work area.