Bill of Material Structure Report

Use the Bill of Material Structure Report to report the detail for all levels of an engineering or manufacturing bill of material. You can multiply the component usage by an explosion quantity to get an extended quantity.

Report Submission

In the Submit Requests window, select Bill of Material Structure Report in the Name field.

Report Parameters

Item Selection

Choose one of the following options:

Range Report the bill structure for the range of items you specify.
Specific Report the bill structure for the specific item you specify.

Item

Enter a specific item to report its bill structure.

Alternate Selection

Choose one of the following options:

All Report the bill structure for the primary and alternate assemblies.
Primary Report the bill structure for only the primary assembly.
Specific Report the bill structure for the alternate assembly you specify.

Alternate

Enter a specific alternate to report.

Revision

Enter a revision for the item. The bill structure associated with this revision is printed.

Date

Enter a revision date and time. If you entered a specific item and a revision, the date defaults to the highest date of the revision. The bill structure effective as of this date and time is printed.

Items From/To

To restrict the report to a range of items, select the beginning and ending item numbers.

Category Set

Enter a category set. The bill structure information associated with this category set is reported. The category set you defined for your functional area is the default.

Categories From/To

To restrict the report to a range of categories, select the beginning and ending category.

Levels to Explode

Enter the number of levels to explode for the bill of material. The default is the value specified when bill of material parameters were defined.

Implemented Only

Indicate whether to report only implemented or all components used by assemblies as of the effective date.

Display Option

Choose one of the following options:

All Report all past, current, and pending components associated with the bill.
Current Report all components effective as of the revision date.
Future and current Report all future and current components as of the revision date.

Explosion Quantity

Enter a quantity to explode. This quantity is used to calculate the requirements for the components of the parent item by multiplying this quantity by the component usage in the bill of material.

Assembly Detail

Indicate whether you want to print assembly detail associated with the bill.

Order Entry Detail

Indicate whether to print order entry detail for the components on the bill.

Leadtime and Other Detail

Indicate whether to print lead time details associated with the components on the bill.

Reference Designators

Indicate whether to print reference designators for the components on the bill.

Substitute Components

Indicate whether to print substitute components for the components on the bill.

Order By

Choose one of the following options:

Item Seq, Op Seq For each bill level, order the components by item sequence, then by operation sequence.
Op Seq, Item Seq For each bill level, order the components by operation sequence, then by item sequence.

Use Planning Percent

Indicate whether you want to use the planning percent to calculate the component requirements of the present item. Component requirements are calculated by multiplying the component usage quantity by the explosion quantity, and then multiplying the component planning percent.

See Also