Siebel Field Service Guide > Scheduling and Dispatch > Introduction to Siebel Scheduling >

Schedule Horizons


The ABS and Optimizer define the following time periods for scheduling of activities:

Both the ABS and the Optimizer horizons are represented by a single time line (Figure 2), since both are measured from a current time (specifically, the time for loading data (see Loading and Reloading Service Region Data).

Figure 2 shows an example of how these time periods are typically defined. The Glued period is day 1. The Contract Scheduling period is days 2 through 7. The Optimizer horizon, which spans the Glued period and the Contract Scheduling period, is days 1 through 7. The ABS horizon is days 8 through 21, and appointment booking is done for that period of time.

Figure 2.  Scheduling Horizons

Click for full size image

Activities move from right to left along this time line. For example, a service activity may follow this scenario: