Siebel Object Types Reference > Siebel Object Types Reference > Task Object Types >
Task Branch
A task branch connects two task steps. It controls the flow of a task UI. This object type occurs in the following location in the object hierarchy:
- Siebel Objects > Task > Task Branch
Table 185 describes properties that Siebel CRM uses with a task branch.
Table 185. Properties of the Task Branch
|
|
Label (O) |
Specifies the text that Siebel CRM displays on this task branch in the Task Designer. |
Name (R) |
Specifies the name of this task branch. |
Parent Name (S) |
Specifies the name of the task step that contains this task branch. |
Type (R) |
Specifies the type of this task branch. You can use one of the following values:
- Condition. Use a condition for this task branch.
- Default. If no other conditions are met, then use this task branch. Siebel CRM ignores any conditions that are defined for this task branch.
- Connector. Do not use any condition branching.
- Error Exception. Use exception handling. This connector type captures system errors. For example, the Assignment Manager server component is not available.
- User Defined Exception. Use exception handling. This connector type captures errors that you define. For example, the user attempts to save an incomplete order.
|
|