C H A P T E R  1

Overview of the Sun Netra CT 900 Server Installation

This chapter provides an overview of the tasks to install the Sun Netra CT 900 server. Detailed instructions for each task are provided on the pages specified.


Step

Task

Detailed Instructions

1.

Unpack your system.

Unpacking the System

2.

Mount the shelf in a rack.

Choosing a Rackmount Kit

3.

Make the DC power connections.

Connecting DC Power

4.

(Optional) Install additional cards.

Installing the Cards

5.

Connect the cables to the shelf alarm panel.

Connecting the Cables to the Shelf Alarm Panel

6.

Connect the cables to the switches.

Connecting Cables to Switches

7.

Connect the cables to the node cards.

Connecting Cables to the Node Boards

8.

Install the operating system, if necessary.

Installing and Using the Software