JavaScript is required to for searching.
Skip Navigation Links
Exit Print View
Sun Blade 6000 Modular System

Site Planning Guide

search filter icon
search icon

Document Information

Using This Documentation

Downloading Chassis Firmware

Documentation and Feedback

About This Documentation

Introduction to Site Planning

Customer Obligations

System Configuration

Site Planning Checklist

Preparing the Site for System Installation

Load-Bearing and Handling Precautions

Power and Electrical Requirements

Power Consumption

Power Budgeting

Electrical Requirements

Power Cords

Grid Redundancy

Cooling Requirements

Temperature and Humidity Requirements

Airflow Requirements

Clearance for Service and Aisle Requirements

Route to the Data Center

Rackmounting Considerations

Mounting the Chassis in a Rack

Compatible Cabinets

Number of Chassis Supported in a Rack

Facility Safety

Secure Installation Requirements

Placement of Product

Hazardous Conditions Precaution

Specifications

Shipping Crate Physical Specifications

Chassis and Components Dimensions and Weights

AC Power Requirements

Environmental Specifications

Thermal Design Specifications

Acoustic Noise Emissions

Regulatory Compliance

Glossary

Index

Preparing the Site for System Installation

Install the Sun Blade 6000 modular system in accordance with the local safety codes and regulations at the facility site. You must be familiar with and adhere to the safety precautions in the Sun Blade 6000 Modular System Safety and Compliance Manual.

Do not make mechanical or electrical modifications to the equipment. Oracle, Inc. is not responsible for regulatory compliance of a modified Oracle product.

These topics provide information that you need to prepare your site for system installation: