Using the Supply Chain Analyst Dashboard

This chapter covers the following topics:

Understanding the Supply Chain Analyst Dashboard

The Supply Chain Analyst role has access to a predefined dashboard with a selection of different seeded reports. These reports enable the supply chain analyst to perform tasks related to supply chain analysis. The report pages leverage the flexibility of the Oracle Business Intelligence – Enterprise Edition (OBI-EE), which enables the layout and content of the delivered reports to be changed by the user

The reports are organized in logical groupings as pages, or tabs, within the Supply Chain Analyst Dashboard.

For details on how to use the OBI-EE features, see Oracle Business Intelligence Answers, Delivers, and Interactive Dashboards User Guide.

These pages are available for the supply chain analyst:

The Glossary page provides:

Overview of APCC Plan Details

APCC is expanded to increase your capabilities to understand and analyze your plans. You can:

From the Supply Chain Analyst dashboard, you can access detailed information about:

Understanding Plan Launch and Data Loads

ASCP, SPP and RP plans enable order level details for any given plan run by using the plan launch parameter, Enable Details, in APCC. When enabled, the APCC data model provides complete details on:

Understanding the Plan Details Tab

The Plan Details tab, formerly named the Demand Fulfillment tab, shows the Build Plan Report (the master report) with detailed reports. The detailed reports are:

the picture is described in the document text

You can access the Plan Details tab from the Plan Health Summary tab or the Exception tab of the Supply Chain Analyst dashboard.

Note: Plan prompt contains only current versions. It does not include archived versions.

In addition, the master report, Build Plan passes End Pegged Item context to the detailed reports when you click a Total Demand or Total Supply in the table.

Understanding the Order Details Report

The Order Details report filters by End Pegged Item. It provides information on the following attributes:

There are hyperlinks to ADF forms from the following columns:

Understanding the Pegging Details Report

The Pegging Details report filters by End Pegged Item. It provides information on the following attributes:

The following columns of the Pegging Details report are hyperlinked to ADF forms:

Understanding the Exception Detail Report

The Exception Details report filters by End Pegged Item. It provides information on the following attributes:

Understanding the Plan Detail Data Model

The following tables are added to the data model to support APCC Plan Details:

Table Name Table Area Description New Measures New Dimensions
Order Details Orders MSC_SUPPLIES union
MSC_DEMANDS
Cumulative Quantity
Order Quantity
Order
Order Details Pegging Supply and end demand pairs Pegged Quantity End Demand
Order
Exception Details Exceptions Cached data of existing MSC_EXCEPTION_DETAILS_V Days Late
Due Date
From Date
Load Ratio
Material Available Date
Order Number
Order Quantity
Quantity Satisfied by Due Date
To Date
N/A

The following dimensions are added to the data model to support APCC Plan Details:

Dimension Name Description Physical Table Attributes
End Demand End demand order attributes, sourced from MSC_ORDERS_F Dim_END_DEMAND End Line Number
End Order Due Date
End Order Number
End Order Quantity
End Demand Simplified duplicate of Customer dimension Dim_END_DEMAND+CUSTOMER End Customer
End Customer Site
End Demand Simplified duplicate of Order Type dimension Dim_END_DEMAND+ORDER_TYPE End Order Type
End Demand Simplified duplicate of Organization dimension Dim_END_DEMAND+ORGANIZATION End Item Organization
Order Order attributes, sourced from MSC_ORDERS_F Dim_ORDER Action
Days Late
Firm Date
Firm Flag
Firm Quantity
Line Number
Material Available Date
Need By Date
Old Due Date
Order Number
Order Priority
Order Quantity
Original Order Quantity
Quantity by Due Date
Requested Date
Reschedule Days
Suggested Due Date
Suggested Order Date

Launching and Archiving Plans in APCC Plan Details

In Plan Details, you launch your plan using the parameter, Enable Details in APCC. This parameter applies to ASCP and SPP as well as the Save Plan page in RP.

The parameter in Plan Details to archive plan summary is Enable Details. Valid values are Yes and No. If set to Yes, the system invokes three more Archive One Package child requests to populate the three details fact tables. The default is No.

Integration of Oracle Advanced Planning Command Center and Oracle Inventory Optimization

Oracle Inventory Optimization (IO) integrates with Oracle Advanced Planning Command Center (APCC) for accounting for cycle inventory in safety stock calculation and warehouse capacity constraints. Several measures and seeded reports in APCC support:

Managing Inventory Optimization Plans from Advanced Planning Command Center

The integration between Oracle Inventory Optimization and Oracle Advanced Planning Command Center lets you define multiple IO plans, modify their inputs, compare plans, launch plans, and evaluate their results, from within APCC. You can do this on two levels:

You can work with your IO plans from the Inventory Analysis page of the Supply Chain Analyst dashboard and the SLA Analysis page of the Service Supply Chain Analyst dashboard.

In APCC you can:

While reviewing the plan results, you can look at your plan inputs. For example, while reviewing the recommended safety stock values, you may want to review the lead time variables. To support this analysis, the system archives measures related to inventory planning, makes them available in APCC when it archives the base IO plans, and archives them in APCC when you set up and launch a plan in APCC.

You can see these inventory planning measures associated with each plan:

For more information about the integration of IO and APCC, refer to the When a DRP plan is launched, users will have the option to keep the previous version of the plan archive around (for comparison purposes) or overwrite the previous version with the current version. This is done using the new plan launch parameter “Archive Current Version of Plan Summary” similar to ASCP Plans. (Default value for this parameter is No).

The APCC measures and their conforming dimensions and aggregation rules are shown in the following tables:

the picture is described in the document text

the picture is described in the document text

Pushing Warehouse Capacity Facts and Dimensions to APCC

The Archive Plan Summary concurrent program has facts and dimensions that support pushing warehouse capacity to APCC. The facts and dimensions are:

Facts:

Dimensions

Note: The facts are pushed to APCC regardless of existence of any Warehouse Capacity Exceeded Exception.

Understanding the Seeded Reports

Five Inventory Optimization seeded reports are available on the Inventory Planning tab in APCC. The five reports are:

Warehouse Capacity Report - Capacity at Storage Type Level is the default report.

Integration of Oracle Advanced Planning Command Center and Oracle Rapid Planning

APCC supports Rapid Planning reports in the same manner that it supports drilldown to the ASCP workbench. Listed below are the Supply Chain Analyst Dashboard pages that you can use to view Oracle Rapid Planning information:

Drilldowns from APCC to Rapid Planning are available from Item, Organization or Resource column only.

When you are accessing the Rapid Planning reports as a drill down from APCC, the Plan being passed must either be loaded or loaded into memory and the relevant report in Rapid Planning displayed with the passed context. The data from the last saved report is displayed. This may be different from what is displayed in APCC if the archive workflow was not run after the changes were made in Rapid Planning.

Note: If there is an instance of Rapid Planning already open by the user, then it will be refreshed when opening a drill down report from APCC. It will not be opened in a new browser. If, on the other hand, there is no instance of Rapid Planning already open the Rapid Planning report is displayed in a new browser.

Using the Plan Health Summary Page

This section provides an overview of the Plan Health Summary page and discusses:

Understanding the Plan Health Summary Page

The Plan Health Summary page provides a high-level summary of the health of the supply chain plan. It displays primary measures for supply and demand, resources, and exceptions. It also enables the supply chain analyst to compare an archived version of a plan against a current version, or compare two or more plans.

To access the Plan Health Summary page:

  1. Select the Supply Chain Analyst responsibility.

  2. Select Supply Chain Analyst Dashboard.

the picture is described in the document text

Page Level Filters

Page level filters are provided at the top of the Plan Health Summary page. Page-Level filters are used to filter the results of the work areas.

This table lists the page level filters for the Plan Health Summary page:

Filter Description
Archived Plans Select from a list of plans from which an archived plan can be selected. Multiple plans can be selected. This is a required field.
Baseline Plan Select from a list of plans that are to be used as the baseline. Only one plan can be selected. This is a required field.
Category Select from a list of categories. Multiple categories can be selected. This is an optional field.
Resource Group Select from a list of resource groups. Multiple resource groups can be selected. This is an optional field.
Organization Select from a list of organizations. Multiple organizations can be selected. This is an optional field.
Period Start Select from a list of date and time selections. A range of date and time can be selected. This is an optional field.

Shipments and Production Trends

The Shipment and Production Trends report enables the user to evaluate:

To view an example of the Shipments and Production Trends report, see Understanding the Plan Health Summary Page

In addition to the page level filters at the top of the page, users can specify this filter for the report:

Field Description
View Select how you want to view the report. Options include Time Trend Chart and Time Trend Table.
The Time Trend Chart view plots the shipment history and planned shipments over time using a line graph. The Time Trend Table view provides the values that correspond to the Time Trend Chart view.

Additional reports that you can be access from the Shipment and Production Trends report are (listed in alphabetical order):

APCC Plan Details

The Plan Health Summary tab of the Supply Chain Analyst Dashboard accesses the ASCP and RP. At the plan level, you can monitor how the plan is performing by looking at the performance tiles, which are color-coded or texture-coded.

To access plan details, drill down from the performance tiles on the Plan Health Summary tab, then click Plan Details.

the picture is described in the document text

Note: Comparison Plans and Resource Group criteria are not included in this summary.

In the following explanations, online informational tiles are represented in colors. In the documentation, the tiles are represented by textures, which represent the colors as follows:

the picture is described in the document text

Measure Red Green
Fill rate >90 <80
Inventory Turns <5 >8
Days of Cover >25 <10

Only the three measures with the thresholds indicated below will be colored red, yellow or green, based on their value. The remaining tiles are always blue

the picture is described in the document text

You can drill down from each of these tiles to the Plan Details tab. Page filters do not change. This passes the measures from the dashboard prompts to the Plan Details tab.

Demand and Supply Summary

The Demand and Supply Summary report enables the user to determine how demand and supply differ between a baseline plan and archived plans.

the picture is described in the document text

For a list of the additional reports that you can access from the Demand and Supply Summary report, see Demand and Supply Summary

Resource Summary

The Resource Summary report enables the user to determine how resource utilization varies between baseline and archived plans.

the picture is described in the document text

Additional reports that you can access from the Resource Summary report are (listed in alphabetical order):

Exception Summary Report

The Exception Summary report enables the user to:

The Exceptions Summary report is detailed into six subreports:

Item Exception Summary Report

The Item Exception report is a new report that enables users to analyze an exception severity based on a specified measure aggregated by specific seeded dimensions such as Organization, Category, and Organization-Category in the Baseline plan. You can use the page level filters to create this report for specific organizations, categories, and periods and view the results as a bar graph or table.

The Item Exception report provides the following facts:

You can group your results by:

Below is an example of an Item Exception Summary Report

the picture is described in the document text

By double clicking on an entity cell, you can drill down to the underlying applications. The contexts that are passed down are the plan and the entities associated with each cell. In the resulting window, all items with the Items with a Shortage exception in the organization and category are displayed. Drilldown to applications is not supported from this report. However, drilldown along the dimensional model is supported, for example, Category to Item.

The drilldown from this report is available for all values specified in the Group By field.

Note: The Resource value in the Group By field is disabled for DRP and CP plans. You can drill down to Service Parts Planning (SPP) only if the report is grouped by Item, Category / Item, Customer / Item, or Supplier / Item. This report may be displayed with the following Plans ASCP, DRP, SPP, SNO and CP.

The formatting of the Exception columns is based on the selected measure:

Resource Exceptions Summary Report

The Resource Exception Summary report enables users to analyze a Resource related exception severity based on a specified measure aggregated by specific seeded dimensions such as Organization, Category, and Org / Category in the Baseline plan. User can also use the page level filters to create this report for specific organizations, categories, and periods.

You view this report by plan in table or bar graph format. If you view the report in table format, you can filter your results in two more parameters in addition to the page level filters:

The Resource Exception Summary report provides the following facts:

You can group your results by:

Below is an example of a Resource Exception Summary report:

the picture is described in the document text

Drill downs to applications is not supported from this report. However, drilldown along the dimensional model is supported, for example, Category to Item.

Note: The Resource value in the Group By field is disabled for DRP and CP plans.

Note: You can drill down to Service Parts Planning (SPP) only if the report is grouped by Item, Category / Item, Customer / Item, or Supplier / Item. This report can be displayed with the following Plans ASCP, DRP, SPP, SNO and CP.

The following windows of the underlying applications are displayed as a result of drilling down from the above report:

The formatting of the Exception columns is based on the selected measure:

the picture is described in the document text

Additional reports that can be accessed from the Exception Summary report are (listed in alphabetical order):

Launching a Plan From Within APCC

You can launch your plan and analyze the impact of your changes on your plan directly in APCC. In some cases, you may want to run the plan without taking a new snapshot to see the impact of your edits. In other cases, you may want to take a new snapshot and run the plan.

When you take a new snapshot, any previous edits from the material plan, resource plan, or orders user interface (UI) are overlaid. Edits to the item simulation set remain unchanged since the simulation set is re-applied after the snapshot is taken.

Use the checkbox in the ASCP Launch Plan parameters to accommodate both scenarios. When you select the Launch Plan link, the system displays the Launch Plan dialog and allows you to select the appropriate options and then run the plan.

Launching the Plan

To launch your plan, follow the steps below:

  1. Click the Plan Health Summary tab or the Demand and Supply tab of the APCC dashboard.

  2. From the ASCP Plan Actions box on your screen, select Launch Plan, as shown below.

    the picture is described in the document text

  3. Scroll down and select the baseline or comparison plans you wish to carry as context into the ASCP Plan Actions.

    Note: Archived plans are not available for selection.

  4. If you wish to perform a batch re-plan, which will factor in all the edits you have made, check the Net Change Simulation checkbox, as shown below.

    Note: If you select the Net Change Simulation checkbox, all other parameters are disabled.

    the picture is described in the document text

    If you do not select to perform a net change simulation, then the Launch Plan dialog functions are identical to those in the current ASCP Launch Plan dialog. That is, the options available and the output are identical to those of ASCP.

    After you press OK, a dialog appears showing the plan name and request ID. For more information on the Launch Plan options available and the output in ASCP, refer to the Oracle Advanced Supply Chain Planning Implementation and User's Guide.

  5. When the launch plan is finished running, press Go button on the dashboard to refresh the page and see the changes.

Note: Because the Launch Snapshot parameter works like the ASCP Launch Plan Snapshot parameter, any edits to material plan, resource plan, or orders are overlaid with the new snapshot. The edits to the item simulation set remain unchanged and are reapplied after the new snapshot is taken.

When you select either Launch Plan or Launch Net Change Simulation from the ASCP Plan Actions box, the selected plan is passed in as context and the applicable launch plan dialog appears.

Note: If you are using the Plan Details feature, you can use the parameter Enable Details in APCC. This parameter applies to ASCP and SPP as well as the Save Plan page of RP.

Releasing a Plan From Within APCC

To release your plan in APCC, follow the steps below:

  1. Navigate to the Orders UI using one of the options described in the section Navigating to the Orders User Interface in this document.

  2. From the Actions drop-down menu, select Mark for Release.

    As soon as your orders are marked for release, you can edit the Implement fields, as shown below.

  3. Edit the Implement fields, as required.

    the picture is described in the document text

  4. From the Actions drop-down menu, select Release Plan.

    The Release Plan dialog appears once the release is complete.

    the picture is described in the document text

Saving Your Changes

As you make your edits, the system updates the firm date, firm quantity and firm status of the edited planned orders, as well as forecast records, or manual demands that make up the bucketed number. These changes are not committed to the database until you choose to save and close the dialog. If there are unsaved changes when you try to close the dialog, you will be asked whether or not you want to save your changes.

Understanding the Orders User Interface Features

The orders are filtered based on the context that was passed in or by the search criteria you enter. You can also edit selected columns from a drop-down menu or by entering a specific value.

Order UI features are listed below:

the picture is described in the document text

Understanding the Search Fields

The search options are listed in the table below.

Fields Comment
Organization,
Category
Item
Order Type
Customer
Source Supplier
Optional. Multi-Select. Valid values are:
  • Equal To

  • Starts With

  • Contains

Suggested Due Date
Material Available Date
Optional. Single value for all operators, except the Between operator, which requires two values. Valid values are:
  • Equal To

  • Between

  • Greater Than

  • Less Than

Understanding the Table Columns

The table columns provide several areas of information. Below is the complete list of available columns and whether you can edit their values. To access all the available columns of information, use the horizontal scroll bar at the bottom of your screen.

Column Editable (Yes/No) Comments
Organization
Item
Description
Order Type
Order Number
Sugg Due Date
Qty/Rate
Action
Source Org
Source Supplier
Source Supplier Site
Customer
Priority
Customer Site
Material Available Date
Sugg Dock Date
Need by Date
Sugg Start Date
Sugg Ship Date
Sugg Order Date
No No Comments
Marked for Release Checked when the Mark for Release action is taken from the action menu. No Comments
Firm Status
Implement Date
Implement Qty/Rate
Implement As
Firm Date
Firm Quantity
Yes No Comments
Order Value No Order Value differs based on order type.
Sales Order = Order Qty * Unit Price (on the order)
Purchase Order = Order Qty * Unit Price (on the order)
Forecast = Dmd Qty * List Price (from Item attributes)
Planned Order = Order Qty * Item Standard Cost

The following table illustrates which fields are editable, based on the order type, as well as which order types are eligible for release:

Editable Fields Editable Order Type (EOT) Purchase Order EOT Purchase Requisition EOT Work Order EOT Planned Order EOTForecast EOT Sales Order EOT manual Demand Comments
New Date x x x x x x x  
New Quantity x x x x x x x For Purchase Orders, Work Orders cannot be set to a non-zero quantity.
Order Priority         x x x  
Implement Date x x x x        
Implement Rate Qty x x x x       For Purchase Orders, Work Orders cannot be set to a non-zero quantity.
Release Status by means of Action x x x x   x   For sales orders, only orders with recommended changes are release.

Understanding the Table Toolbar

The toolbar across the top of your plan provides various options with which to customize your display. These options are explained below.

Action

The Action drop-down menu has three options:

View

The View drop-down menu has four options:

Passing into Context

The context is passed in from either a query or from the Editable Material Plan into this UI. You can pass into context by drilling from the editable Material Plan or directly from ASCP Plan Actions, as described earlier in this document in the section Navigating to the Orders User Interface.

You can pass any combination of the following values into context:

Note: While navigation is generally passing single values by clicking on a single product category and navigating to the editable material plan, the editable material plan is also called from ASCP personal queries, which can pass multiple product categories into the editable material plan.

You can override the context that was passed in by entering search criteria and pressing the Search button. The original context is discarded and the table is filtered using your search criteria.

Using the Orders User Interface

The orders user interface (UI) streamlines the business process by providing direct access to your orders from within APCC. You can search over a set of orders, mark orders for release as well as edit form order status or change their priority.

Navigating to the Orders User Interface

From within APCC, you navigate to the Orders UI using one of the following options:

Option 1: Drilling from the Editable Material Plan to the Orders UI

  1. From the Supply Chain Analyst Dashboard, open the editable Material Plan, using any of the options described in the section. Navigating to the Editable Material Plan in this document.

  2. Select one or more cells in the plan and right click to view the orders related to the selected cells. For example, if you select planned orders for items CM66323 and CM66324 for the weeks of 3-Oct and 10-Oct, the system displays the planned orders that make up the four selected cells.

    the picture is described in the document text

    A context menu opens.

  3. From the context menu, select Order.

Option 2: Accessing Orders UI Directly from ASCP Plan Actions

  1. From the Supply Chain Analyst Dashboard, click either the Plan Health Summary tab or the Demand and Supply tab.

  2. In the ASCP Plan Actions pane, click Orders.

    the picture is described in the document text

  3. Select the desired plan, either baseline or comparison, from the plan pull-down

    Note: Archived plans are not available for selection.

    In addition, the Organization and Category dashboard page filters are passed in as context into the Orders UI.

Using the Demand and Supply Page

This section provides an overview of the Demand and Supply page and discusses:

Understanding the Demand and Supply Page

The Demand and Supply page enables the supply chain analyst to evaluate how demand and supply are balanced over time and how they vary from one plan to another.

the picture is described in the document text

Page Level Filters

Page level filters are provided at the top of the page to filter the results of all reports.

This table lists the page level filters for the Demand and Supply page:

Filter Description
Comparison Plans Select from a list of comparison plans. Multiple plans can be selected. This is a required field.
Baseline Plan Select from a list of plans to use as a baseline. Only one plan can be selected. This is a required field.
Category Select from a list of categories. Multiple categories can be selected. This is an optional field.
Organization Select from a list of organizations. Multiple organizations can be selected. This is an optional field.
Period Start Select from a list of date and time selections. A range of date and time can be selected. This is an optional field.

Demand and Supply Summary

The Demand and Supply Summary report enables the user to determine how demand and supply is different between a baseline plan and comparison plans.

To view the Demand and Supply Summary report, see Understanding the Demand and Supply Page

Additional reports that can be accessed from the Demand and Supply Summary report are (listed in alphabetical order):

Demand Change by Customers

The Demand Change by Customers report enables the user to compare demand from the baseline plan to demand from the comparison plan for multiple customers.

The difference in total demand for each customer between the two plans is computed as a percentage and the percentage is sorted in descending order. By default the report displays the top ten customers. Using the MSC: Value of N for all top/bottom-N reports in Dashboards profile, the user can adjust the number of top customers displayed.

the picture is described in the document text

The customer name is a link, which can be used to display all customer sites for that customer. Use the Return or Back button to return to the report that lists all customers.

Additional reports that can be accessed from the Demand Change by Customers report are (listed in alphabetical order):

Supply Change by Categories

The Supply Change by Categories report enables the user to compare supply from the baseline plan to supply from the comparison plan for multiple categories.

The difference in total supply for each category between the two plans is computed as a percentage and the percentage is sorted in descending order. By default the report displays the top ten categories. Using the MSC: Value of N for all top/bottom-N reports in Dashboards profile, the user can adjust the number of top categories displayed.

the picture is described in the document text

The category name is a link, which can be used to display all items for that category. Use the Return button to return to the report that lists all categories.

An additional report that can be accessed from the Supply Change by Categories report is the Demand and Supply Trend (Baseline Plan). The ASCP Workbench – Items link takes the user directly to the Advanced Supply Chain Planner Workbench.

Demand and Supply Trend Across Plans

The Demand and Supply Trend Across Plans report enables the user to evaluate the trends of demand and supply over time and if the trends change between the baseline and comparison plans.

To view the Demand and Supply Trend Across Plans report, see Understanding the Demand and Supply Page

In addition to the page- level filters at the top of the page, users can specify these filters for the report:

Filter Description
Measure Select a measure to evaluate, which appears on the vertical axis. Options include Total Supply, PAB – units (Projected Available Balance), Safety Stock, and Total Demand.
View Select how you would like to view the report. Options include: Time Trend Chart and Time Trend Table.
The Time Trend Chart view plots the measure option over the manufacturing period start date using a line graph. The Time Trend Table view provides the values that correspond to the Time Trend Chart view.

Additional reports that can be accessed from the Demand and Supply Trend Across Plans report are (listed in alphabetical order):

The ASCP Workbench – Items link takes the user directly to the Advanced Supply Chain Planner Workbench.

Demand and Supply Trend (Baseline Plan)

The Demand and Supply Trend (Baseline Plan) report enables the user to compare measures within a single plan. This report plots line graphs for safety stock and PAB units, and bar charts for total demand and total supply.

the picture is described in the document text

In addition to the page level filters at the top of the page, users can specify this filter for the report:

Field Description
View Select how you would like to view the report. Options include: Time Trend Chart and Time Trend Table.
The Time Trend Chart view plots the measures over plans using a line graph and bar chart.
The Time Trend Table view provides the values that correspond to the Time Trend Chart view.

Additional reports that can be accessed from the Demand and Supply Trend (Baseline Plan) report are (listed in alphabetical order):

The ASCP Workbench - Items link takes the user directly to the Advanced Supply Chain Planner Workbench.

Total Demand by Customers (Baseline Plan)

The Total Demand by Customers (Baseline Plan) report displays total demand by customer in a bar chart or table format.

This report shows data for the plan selected as the baseline plan in the page filters. By default, the report displays the top 10 customers. Using the MSC: Value of N for all top/bottom-N reports in Dashboards profile, the user can adjust the number of top customers displayed.

You can access this report from multiple locations.

To access this report from the Plan Health Summary page:

  1. Select the Supply Chain Analyst responsibility.

  2. Select the Supply Chain Analyst Dashboard.

  3. Select the Total Demand value link from the Demand and Supply Summary report.

To access this report from the Demand and Supply page:

  1. Select the Supply Chain Analyst responsibility.

  2. Select the Supply Chain Analyst Dashboard.

  3. Select Demand and Supply tab.

the picture is described in the document text

In addition to the page level filters at the top of the page, you can specify this filter for the report:

Field Description
View Select how you want to view the report. Options include Chart and Table.
The Chart view plots total demand for each customer using a bar graph. The Table view provides the values that correspond to the Chart view.

An additional report that you can access from the Total Demand by Customers (Baseline Plan) report is the Demand and Supply Trend within a Plan report. The ASCP Workbench - Supply and Demand Detail link takes the user directly to the Advanced Supply Chain Planner Workbench.

Total Supply by Categories (Baseline Plan)

The Total Supply by Categories (Baseline Plan) displays total supply by item category in a bar chart or table format.

This report shows data for the plan selected as the baseline plan in the page filters. By default the report displays the top ten categories. Using the MSC: Value of N for all top/bottom-N reports in Dashboards profile, the user can adjust the number of top categories displayed.

You can access this report from multiple locations.

To access this report from the Plan Health Summary page:

  1. Select the Supply Chain Analyst responsibility.

  2. Select the Supply Chain Analyst Dashboard.

  3. Select the Total Supply value link from the Demand and Supply Summary report.

To access this report from the Demand and Supply page:

  1. Select the Supply Chain Analyst responsibility.

  2. Select the Supply Chain Analyst Dashboard.

  3. Select the Demand and Supply tab.

the picture is described in the document text

In addition to the page level filters at the top of the page, you can specify this filter for the report:

Field Description
View Select how you want to view the report. Options include Chart and Table.
The Chart view plots total supply for each category using a bar graph. The Table view provides the values that correspond to the Chart view.

An additional report that you can access from the Total Supply by Categories report is the Demand and Supply Trend within a Plan report. The ASCP Workbench - Supply and Demand Detail link takes the user directly to the Advanced Supply Chain Planner Workbench.

Understanding the Editable Material Plan

The Material Plan allows you to conduct a typical planning flow within the application without having to navigate to other Value Chain Planning (VCP) applications, such as ASCP.

You can make edits to the plan, launch a plan and release a plan from within APCC. Release To Execution Systems, User Changes and Simulations, and Launch Plan are the features in APCC that let you complete these processes.

the picture is described in the document text

Using the Editable Material Plan

APCC provides the capability to mass edit a group of planned orders in a bucketed format in the context of a grouping. As an example, you can mass edit a category of items. You can edit:

The Material Plan User Interface lets you mass edit supply and demand records. It displays planned orders in a bucketed format, including a set of total rows. The Material Plan provides direct editing of bucketed values whose changes are allocated back to the planned orders. The firm status of the planned orders will then be set.

Understanding the Editable Material Plan General Layout

The supply and demand records display in a bucketed horizontal format similar to the format of the horizontal plan, but with a restricted set of series. The records that are displayed contain all the items that you included in the criteria that was passed in as context, as well as an additional row or set of rows for the category of items in the search as a calculated total. You can edit the value for the individual items, and view the sum in the category change field in real time.

An example of an editable material plan is shown below. Note that the name of the plan that was passed into the material plan is display in the title.

the picture is described in the document text

Understanding the Editable Material Plan Features

The editable Material Plan has the following features:

Note: When loading the Material Plan table, the system loads only the number of rows that were specified in the profile option MSC:New Material and Resource Plan Fetch Size. As you scroll down, the system continues to load additional rows.

Understanding the Table Toolbar

Across the top of the Material Plan are the menus and tabs that allow you to customize your Material Plan. They include:

Actions and View are drop-down menus, providing various alternatives. The remaining options are tabs. The following section outlines each item and its function.

Actions: The Actions drop-down menu provides three options:

Setup: Setup invokes the setup dialog for the currently selected layout.

Layout: Required. Defaults to your default layout. You can define your layouts and select which measures you want to see as well as the time dimension. When you choose a different layout, the system automatically redisplays the material plan using the newly selected layout.

Note: All measures that are editable in the layout of your Material Plan are highlighted

Organization: Optional. Organization filters the material plan by the selected organizations. If one or more organizations are passed in as context, these organizations will appear as selected organizations in the choicelist. If needed, you can then change which organizations you wish to view.

Category Set: Required. Defaults based on the category set passed in from the calling application. If Category Set is null, the APCC default Category Set, which is part of your user profile, is used.

Category: Filters the material plan by the selected product categories. If one or more categories are passed in as context, these categories will appear as selected categories in the choicelist. The values appearing in the list of categories is based on the chosen category set.

Recalculate: Recalculates measures, based on your latest changes. All the changes you make to your Material Plan are highlighted until you perform a recalculation.

Setting Up the Layout

From the main menu, go to your Setup window. In the Setup window, you can choose what rows you want displayed in your material plan and what level of bucketing is applied for time. These choices must be saved as part of a layout, which you can designate as either be private for your use only or public for use by other users.

The set up dialog for layouts of Material Plans describes:

the picture is described in the document text

The table below lists and describes each field in your setup.

Name Type Description
Name Text The name of the layout. Must be unique across all layouts, public or private.
Access Single select choicelist Valid values are:
  • Private: The layout is only accessible by the creator of the layout.

  • Public: The layout is accessible to all users.

Default Checkbox Defines your default layout. You can only have one default layout across all layouts, whether it's private or public layout.
Created By Text Identifies the user who originally created the layout
Created On Date/Time Displays the date and time the layout was created
Last Updated By Text Identifies the user that last updated the layout.
Available Measures Shuttle Displays the measures that are available for display, but have not yet been added to the selected measures. See list of available measures in the Available Measures table below.
Selected Measures Shuttle Displays the measures selected for display. You can move the measures up or down in the list to control the sequence in which measures are displayed. At least one measure must be selected before the layout can be saved.
Axis Single select choicelist Required. Valid Values are:
  • Day

  • Week

  • Period

Action Buttons

The Action buttons and their purpose are shown in the table below.

Name Description
Delete Deletes the layout. When you choose to delete a layout, you will be prompted to confirm the deletion. If you delete your default layout, then the system selects the first public layout.
New When you press New, the values in the General and Layout Tabs are reset accordingly:
  • The Name and Default fields and cleared.

  • The access to Public layouts (the default).

  • The selected measures are retained from whatever view you were displaying prior to selecting the New button.

  • The time axis defaults to Week.

OK When you select OK, the system redisplays the material plan using the latest values that are changed in the layout dialog. For example, if you change the time axis from week to period and press OK, the system redisplays the material plan aggregated to period, even though the change has not yet been saved to the layout.
Save Saves the layout with the latest changes.
Cancel Cancels out of the layout set up. No changes are saved.

Available Measures

The measures that are available for inclusion in the layout are:

Measure Editable (Yes/No)
Beginning on hand No, but recalculated as edits are applied.
Current scheduled receipts No
Dependent demand No
Gross requirements No, but recalculated as edits are applied.
Forecast Yes
Manual Demand Yes
Planned Orders Yes
Projected Available Balance No, but recalculated as edits are applied.
Projected on hand No, but recalculated as edits are applied.
Purchase orders No
Requisitions No
Sales Orders No
Safety Stock No
Total Supply No, but recalculated as edits are applied.
Work Orders No

Column Headings

The column headings of the editable material plan are based on the Time Axis selected, as follows:

Row Headings

The row headings of the editable material plan are fixed as:

Passing in Context

The editable material plan assumes that context will be passed in from the calling application. For example, the context will be passed from an OBIEE query into the material plan. Navigation options are described below. A combination of the following values can be passed in as context:

If Category Set is null, the APCC default Category Set, which is part of your user profile, is used.

If both Organization and Product Category values are missing from the context, the system defaults to the first organization/category combination for filtering. You can then choose whether to display all organization/category combinations or only ones you select.

Note: While navigation from OBIEE is generally passing single values (e.g., clicking on a single product category and navigating to the editable material plan), the editable material plan is also going to be called from ASCP personal queries which could pass multiple organizations or product categories into the editable material plan.

Allocating Bucketed Quantities

When you edit a cell that contains a bucketed quantity in the editable Material Plan, the behavior is identical to the behavior when editing data in the Material Plan in Rapid Planning. When you update cells, the quantity you entered and the date are interpreted as the firm quantity and firm date for the row that corresponds to that cell.

How editing behaves is shown in the table below for your reference:

Measure View By Time Type of Action User Action to Update Interpretation of the Update
Forecast Item-Org/Org-Item/ Days/Weeks/Periods Update Edit Cell  
Manual Demand Item-Org/Org-Item/ Days/Weeks/Periods Update Edit Cell The net difference % is calculated, based on the difference between the new value and old value, and the same percent, either up or down, is applied to all rows that constitute this number and the firm date, firm qty fields are updated on them.
Manual Demand Item-Org/Org-Item Days/Weeks/Periods Create Edit a Zero value Cell Allowed only at item-org or org-item level. The new value is used to create a new “manual demand” row for that item/org (if the context is item/org). If the cell corresponds to any level higher than item/org, then disallow create. On the time dimension, if the cell corresponds to a week/period, insert the demand in the last working day.
Planned Orders Item-Org/Org-Item Days/Weeks/Periods Update Update The net difference % is calculated, based on the difference between the new value and old value, and the same percent, either up or down, is applied to all rows that constitute this number and the firm date, firm quantity fields are updated on them.
Planned Orders Item-Org/Org-Item Days/Weeks/Periods Create Edit a Zero Value Cell Allowed only at item-org or org-item. The new value is used to create a new firm Planned Order row for that item/org, if the context is item/org. If the cell corresponds to any level higher than item/org, disallow create. If the cell corresponds to a week/period, insert the supply in the last working day.

Saving Changes

As you make your edits to the Material Plan, the system updates the firm date, firm quantity and firm status of the edited planned orders, as well as forecast records, or manual demands that make up the bucketed number. These changes are not committed to the database until you choose to save and close the Material Plan dialog. If there are unsaved changes to the Material Plan when you try to close it, you will be asked whether or not you want to save your changes.

Navigating to the Editable Material Plan

You navigate to the Editable Material Plan using any one of the following options:

The plan pull down in the ASCP Plan Actions section allows you to choose either the baseline plan or the comparison plans that you wish to carry as context into the ASCP Plan Actions.

Note: Archived plans are not available for selection.

In addition, the Category and Organization dashboard page filters are passed in as context into the Material Plan as follows:

Navigating to the Editable Material Plan from Demands and Supply Totals Category

  1. From the Supply Chain Analyst dashboard, select Demand and Supply Totals by Category, which is the first option on the list of available navigation options.

    the picture is described in the document text

  2. From Demand and Supply Totals by Category, select Material Plan.

    The Plan name and category are passed in as context to the Material Plan.

    the picture is described in the document text

  3. Click the icon next to the desired category.

    The editable Material Plan for that Plan/Category combination launches.

Navigating to the Editable Material Plan from the Aggregate Horizontal Plan

  1. From the Supply Chain Analyst dashboard, open Demand and Supply.

  2. From Demand and Supply, select Aggregate Horizontal Plan, which is the eighth option on the list of available navigation options.

    the picture is described in the document text

  3. Select the Material Plan link.

Navigating to the Editable Material Plan from the Dashboard

  1. Navigate to either the Plan Health Summary link or the Demand and Supply link.

  2. From the ASCP Plan Actions window on the right-hand side of your window, select Material Plan.

Rapid Planning Supply Demand Plan Drilldowns

The Supply Demand Plan in Rapid Planning is accessible from the following APCC reports:

The context that must be passed to Rapid Planning is one of the following:

Below is an example of the Supply Demand Plan, open at the Main page. At the top right of the screen are tabs, which let you open Exceptions, Items, Material Plan, BOMs, or Sourcing Rules. The page is in the format of a table, with the following columns:

the picture is described in the document text

The exceptions and resource plan views are similar to the Supply & Demand report. When you click on the exceptions tab, you go to the Exceptions view; the Resource Plan is similar to the Supply Demand view.

Excess and Obsolescence

This section describes the excess and obsolescence analyses that are available through the Supply and Demand page of the SCA Dashboard. It discusses the following reports:

In addition to the Excess and Obsolescence reports, two fields in the Item Attributes Mass Maintenance window, Excess Horizon Days and Obsolescence Date, help capture the excess and obsolescence horizons. These fields indicate the horizon that is used in the computation of Excess and Obsolescence. Excess Horizon Days is a number field while Obsolescence Date is a date field with the format DDMONYY. For example, 12JUN10 is June 12th, 2010.

The selection of a plan option triggers the summarization of Excess Horizon Days and Obsolescence Date from the Item Attributes Mass Maintenance to APCC schema as part of the archive workflow. It also triggers the computation of Excess and Obsolescence. The plan type and the corresponding plan option are shown in the table below:

S. No. Plan Type Plan Option
1 Advanced Supply Chain Planning Calculate Key Performance Indicators
2 Service Parts Planning Calculate Key Performance Indicators
3 Distributed Replenishment Planning Calculate Key Performance Indicators
4 Rapid Planning Expose in Planning Analytics

Excess and Obsolescence Reports

This section describes the Excess and Obsolescence Reports. From the Excess and Obsolescence Summary Report, you can drill down to additional reports for a given plan:

the picture is described in the document text

Using the Resources Page

This section provides an overview of the Resources page and discusses:

Understanding the Resources Page

The Resources page enables the supply chain analyst to evaluate how resource utilization has changed from one plan to another.

the picture is described in the document text

Page-Level Filters

Page-level filters are provided at the top of the page to filter the results of all reports.

This table lists the page-level filters for the Resources page:

Filter Description
Comparison Plans Select from a list of comparison plans. Multiple plans can be selected. This is a required field.
Baseline Plan Select from a list of plans to use as a baseline. Only one plan can be selected. This is a required field.
Organization Select from a list of organizations. Multiple organizations can be selected. This is an optional field.
Resource Group Select from a list of resource groups. Multiple resource groups can be selected. This is an optional field.
Period Start Select from a list of date and time selections. A range of date and time can be selected. This is an optional field.

Resource Summary

The Resource Summary report enables the user to determine how resource utilization varies between baseline and comparison plans.

To view the Resource Summary report, see Understanding the Resources Page

Additional reports that you can access from the Resource Summary report are (listed in alphabetical order):

Click Resource Utilization % to access these reports:

Most Utilized Resource (Baseline Plan)

The Most Utilized Resource (Baseline Plan) report enables the user to view the resources that are used the most for the baseline plan.

This report shows data for the plan selected as the baseline plan in the page filters. By default, the report displays the top 10 resources. Using the MSC: Value of N for all top/bottom-N reports in Dashboards profile, the user can adjust the number of top resources displayed.

To view the Most Utilized Resource Baseline Plan report, see Understanding the Resources Page

In addition to the page level-filters at the top of the page, users can specify this filter for the report:

Field Description
View Select how you want to view the report. Options include Chart and Table.
The Chart view plots resource utilization for each resource using a bar graph. The Table view provides the values that correspond to the Chart view.

An additional report that you can access from the Most Utilized Resources (Baseline Plan) report is the Resource Utilization Trend report. The ASCP Workbench – Resources link takes the user directly to the Advanced Supply Chain Planner Workbench.

Least Utilized Resources (Baseline Plan)

The Least Utilized Resource (Baseline Plan) report enables the user to view the resources that are used the least for the baseline plan.

This report shows data for the plan selected as the baseline plan in the page filters. By default, the report displays the bottom 10 resources. Using the MSC: Value of N for all top/bottom-N reports in Dashboards profile, the user can adjust the number of resources displayed.

To view the Least Utilized Resource Baseline Plan report, see Understanding the Resources Page

In addition to the page-level filters at the top of the page, users can specify this filter for the report:

Field Description
View Select how you want to view the report. Options include Chart and Table.
The Chart view plots resource utilization for each resource using a bar graph. The Table view provides the values that correspond to the Chart view.

An additional report that you can access from the Least Utilized Resources (Baseline Plan) report is the Resource Utilization Trend report. The ASCP Workbench – Resources link takes the user directly to the Advanced Supply Chain Planner Workbench.

Resources with Change in Utilization

Utilization varies, for each resource, between baseline and comparison plans.

The difference in utilization percent for each resource between the two plans is computed as a percentage and the percentage is sorted in descending order. By default the report displays the top 10 resources with the most change. Using the MSC: Value of N for all top/bottom-N reports in Dashboards profile, the user can adjust the number of top resources displayed.

the picture is described in the document text

Resource Utilization Trend

The Resources Utilization Trend report enables the user to determine how resources are used over time and whether the trend has changed between the baseline and comparison plans.

the picture is described in the document text

In addition to the page-level filters at the top of the page, users can specify this filter for the report:

Field Description
View Select how you want to view the report. Options include Time Trend Chart and Time Trend Table.
The Chart view plots resource utilization over manufacturing period start dates using a line graph. The Table view provides the values that correspond to the Chart view.

Additional reports that you can access from the Resource Utilization Trend report are (listed in alphabetical order):

Rapid Planning Resource Plan Drilldowns

The Resource Plan in Rapid Planning is accessible from the following APCC reports:

The context that needs to be passed to Rapid Planning is one of the following:

Understanding the Editable Resource Plan

APCC allows you to easily add resource capacity at an aggregate level. For example, you can add capacity to a resource at a week or period level. The Resource Plan provides direct editing of bucketed values whose changes are allocated back to the resource's daily availability.

The resource records are displayed in a bucketed format, including a set of grand total rows. The records that are displayed include all the resources that you included in the criteria that was passed in as context, as well as an additional row or set of rows for the grand totals of all selected resources. As you edit the value for individual resources, the grand total changes in real time.

the picture is described in the document text

Understanding the Editable Resource Plan Features

The editable Resource Plan has the following features:

Understanding the Table Toolbar

Across the top of the Resource Plan are the menus and tabs that allow you to customize your Resource Plan. They include:

Action and View are drop-down menus, providing various alternatives. The remaining options are tabs. The following section outlines each item and its function.

Action: The Action drop-down menu provides three options:

Setting up the Layoutt

From the main menu, go to the Setup window. In the Setup window, you can choose what rows you want displayed in your Resource Plan and what level of bucketing is applied for time. These choices must be saved as part of a layout that you can designate as either private for your use only or public for use by other users.

The set up dialog for layouts of Resource Plans is illustrated below, followed by a table describing:

the picture is described in the document text

Field Descriptions

The table below lists and describes the fields in the setup dialog.

Name Description
Name The name of the layout. Must be unique across all layouts, public or private.
Access Valid values are:
  • Private: The layout is only accessible by the creator of the layout.

  • Public: The layout is accessible to all users.

Default Defines your default layout. You can only have one default layout across all layouts, whether it's private or public layout.
Created By Identifies the user who originally created the layout
Created On Displays the date and time the layout was created
Last Updated By Identifies the user that last updated the layout.
Available Measures Displays the measures that are available for display, but have not yet been added to the selected measures. See list of available measures in the Available Measures table below.
Selected Measures Displays the measures selected for display. You can move the measures up or down in the list to control the sequence in which measures are displayed. At least one measure must be selected before the layout can be saved.
Time Axis Required. Valid Values are:
  • Day

  • Week

  • Period

Action Buttons

The table below lists the Action buttons and describes their function.

Name Description
Delete Deletes the layout. When you choose to delete a layout, you will be prompted to confirm the deletion.
After deleting a layout, the system automatically changes the currently selected layout to your default layout.
If you delete your default layout, then the system selects the first public layout.
New When you press New, the values in the General and Layout Tabs are reset accordingly:
  • The Name and Default fields and cleared.

  • The access to Public layouts (the default).

  • The selected measures are retained from whatever view you were displaying prior to selecting the New button.

  • The time axis defaults to Week.

OK When you select OK, the system redisplays the plan using the latest values that are changed in the layout dialog. For example, if you change the time axis from week to period and press OK, the system redisplays the plan aggregated to period, even though the change has not yet been saved to the layout.
Save Saves the layout with the latest changes.
Cancel Cancels out of the layout set up. No changes are saved.

Available Measures

The measures that are available for inclusion in the layout are listed in the table below:

Measure Editable (Yes/No)
Available Hours Yes
Capacity Load Ratio No, but recalculated as edits are applied.
Cum Hours Available No, but recalculated as edits are applied.
Net Hours Available No, but recalculated as edits are applied.
Non-standard Jobs No
Planned Orders No
Required Hours No
Total Resource Cost No, but recalculated as edits are applied.
Work Orders No

Column Headings

The column headings of the editable material plan are based on the time axis selected.

Row Headings

The row headings of the editable Resource Plan are fixed as:

Passing in Context

The editable resource assumes that context will be passed in from the calling application, from an OBIEE query into the Resource Plan. For more information and the options available, refer to the section on Navigation, below.

Note: Navigation from OBIEE generally passes single values, by clicking on a single resource and navigating to the editable Resource Plan, the editable Resource Plan is called from ASCP personal queries. These queries could pass multiple departments or resources into the editable Resource Plan.

A combination of the following values can be passed in as context:

Allocating Bucketed Quantities

Increasing resource availability

When you allocate an increase in the availability of a resource from week to day or from period to day, the system performs as follows:

  1. Front load the additional resource capacity across the available work days up to, but not exceeding 24 hours in a day. The last shift of each day (for the time bucket updated) would be extended by increasing the hours in the last shift of each day (taking into account the number of resource units).

  2. If all working days have been fully allocated to the 24 hour maximum and there is left over resource capacity that still needs allocating, add capacity to the non-working days starting with the first non-working day of the time bucket and continuing with the remaining non-working days (up to 24 hours for each non working day).

  3. If there is still additional capacity that must be allocated to the time bucket, increase the resource units starting with the first day of the time bucket.

For example, before any changes, Resource A's availability for the week of 12-Mar-12 is as follows:

Resource Units Shift Monday Tuesday Wednesday Thursday Friday Saturday Sunday
2 1 8 8 8 8 8 0 0
2 2 8 8 8 8 8 0 0
Available Capacity (Hrs)   32 32 32 32 32 0 0

Suppose you changed the resource capacity for the week from 160 (5 x 32) to 300, an overall increase of 140 hours for the week. The system responds as follow:

  1. The system starts with Monday and extends the second shift of each day by 8 hours, This adds 16 per day to the resource availability because there are two resource units available. At the end of this first step the resource availability is as follows:

    Resource Units Shift Monday Tuesday Wednesday Thursday Friday Saturday Sunday
    2 1 8 8 8 8 8 0 0
    2 2 16 16 16 16 16 0 0
    Available Capacity (Hrs)   48 48 48 48 48 0 0
  2. Next, the system allocates the remaining 40 hours by adding availability to the non-working days, filling up the first non-working day before proceeding to the next. Since Saturday is a non-working day, the system adds one shift, shift 1, up to a duration of 24 hours.

    Resource Units Shift Monday Tuesday Wednesday Thursday Friday Saturday Sunday
    2 1 8 8 8 8 8 20 0
    2 2 16 16 16 16 16 0 0
    Available Capacity (Hrs)   48 48 48 48 48 40 0

The system added a Saturday shift with a duration of 20 hours. Since there are two resource units, this represents an additional 40 hours of capacity. At this point the system stops because there are no more hours that need to be allocated.

Decreasing a resource's availability:

When allocating a decrease in the resource's availability from week to day or from period to day, the system reduces the hours proportionally. For example, if you reduce a resource's availability on a particular week from 40 hours to 30 hours, the system calculates the percent reduction (25% in this case) and reduces the availability on each day by 25%.

Saving Changes

Changes made to the Resource Plan are not committed to the database until you choose to save and close the resource plan dialogue.

Navigating the Editable Resource Plan

You can navigate from various APCC queries to the editable Resource Plan. The navigation must be defined as a reusable action to allow custom-built queries to call this action and pass in the appropriate context. This is similar to the way a you drill into an APCC query and launch an ASCP form. You can navigate using one of the following options:

  1. Drill down from Most Utilized Resources Table

  2. From ASCP Plan Actions

Accessing the Editable Resource Plan from the Most Utilized Resources Table

To access the editable Resource Plan:

  1. From the Supply Chain Analyst Resource dashboard, click the Resource Plan action.

  2. Drill down from the Most Utilized Resources table to the desired resource.

    the picture is described in the document text

Accessing the Editable Resource Plan from the ASCP Plan Actions

To access the editable Resource Plan:

  1. From the Supply Chain Analyst dashboard, select either the Plan Health Summary link or the Demand Supply Link.

  2. From the ASCP Plan Actions pull down, select the plan you want to carry as context into the ASCP Plan Actions, either the baseline plan or the comparison plans.

Note: Archived plans are not available for selection.

the picture is described in the document text

The plan name is passed in as context to the resource plan.

In addition, the Organization dashboard page filter is passed in as context into the Resource Plan. If the Organization prompt is null, that is, the page is not filtered by organization, the Resource Plan selects the first organization. This limits the amount of data displayed. You can then change the filter fields to the desired organization(s).

Understanding Item Simulation Sets

The item simulation set user interface lets you add or remove items from a simulation set as well as edit the attributes of the items within a simulation set to perform “what if” analyses. You can launch the Item Simulation Set User Interface (UI) by selecting a hyperlink from the APCC dashboard. The item simulation set name that is associated with the plan is passed into the UI as the default item simulation set. If needed, you can refine the item simulation set records you want to display by modifying the search criteria.

Item Simulation Editable Fields

To view all the editable fields in the Item Simulation Set, scroll to the right, using the horizontal scroll bar at the bottom of your Item Simulation Set screen. All the available editable fields are listed in the following table:

Column Editable (Yes/No) Comments
Organization Yes, but only when inserting a new table row. Required. Select from list of valid organizations.
Item Yes, but only when inserting a new table row. Required. Select from list of valid items
Description No Displays the item description associated with the selected item.
Category No Displays the product category associated with the selected item

Note: If the Category Set was not passed in as context, the default APCC category set (user profile) is used to display the item's category.

ATP Components Flag Yes No comments
ATP Flag Yes No comments
Create Supply Flag Yes No comments
Critical Component Yes No comments
DRP Planned Yes No comments
Demand Fulfillment LT Yes No comments
Demand Time Fence Days Yes No comments
End of Life Date Yes No comments
Excessive Horizon Days Yes No comments
Excess Tolerance Percent Yes No comments
Fixed Days Supply Yes No comments
Fixed LT Yes No comments
Fixed Lot Multiplier Yes No comments
Fixed Order Qty Yes No comments
Forecast Control Yes No comments
Include in Excess and Obsolescence Yes No comments
MRP Planning Method Yes No comments
Make or Buy Yes No comments
Max Inventory Days of Supply Yes No comments
Max Inventory Window Yes No comments
Max Ord Qty Yes No comments
Min Ord Qty Yes No comments
Minimum Remaining Shelf Life (Days) Yes No comments
New Planned Order Creation Yes No comments
Obsolescence Date Yes No comments
Order Cost Yes No comments
Planning Time Fence Days Yes No comments
Post processing LT Yes No comments
Pre-Position Point Yes No comments
Preprocessing LT Yes No comments
Processing LT Yes No comments
Round Yes No comments
Safety Stock Days Yes No comments
Safety Stock Method Yes No comments
Safety Stock Percent Yes No comments
Safety Stock Value Yes No comments
Selling Price Yes No comments
Shelf Life Slack (Days) Yes No comments
Shortage Tolerance Percent Yes No comments
Shrinkage Rate Yes No comments
Standard Cost Yes No comments
Standard Deviation Yes No comments
Std Deviation of Interarrival Yes No comments
Std. Deviation for Daily Demand Yes No comments
Substitution Window Yes No comments
Unit Volume Yes No comments
Unit Weight Yes No comments
Unsatisfied Demand Factor Yes No comments
Variable LT Yes No comments
Volume UOM Yes No comments
Weight UOM Yes No comments

Note: When you insert a row into the simulation set, you can select the desired Organization/Item combination. Otherwise, the Organization and Item columns are non-editable.

Note: Once you enter a valid Organization/Item combination, the system copies the attributes from the item table into the simulation set.

Note: If you change a value, either by typing directly into the cell or through mass maintenance, the row is color coded.

Search Fields

The Search fields provide the criteria with which you can find specific simulation sets. The search fields and their functions are listed in the table below:

Column Description
Simulation Set Required field, single select. Valid value is Equal To
This field initially displays the item simulation set name associated with the current plan options. You can override the simulation set name if needed.
Any rows inserted into the table are associated with this simulation set.
Organization Optional field, multi-select. Valid values are:
  • Equal To

  • Starts With

  • Contains

Category Optional field, multi-select. Valid values are:
  • Equal To

  • Starts With

  • Contains

Item Optional field, multi-select. Valid values are:
  • Equal To

  • Starts With

  • Contains

Planner Optional field, multi-select. Valid values are:
  • Equal To

  • Starts With

  • Contains

Item Simulation Set Table Toolbar

The Item Simulation Set table toolbar, which is located immediately above the Item/Org columns, has an Action Menu and a View Menu. These menus provide options that allow you to perform a variety of actions on your simulation sets. Each menu is described below.

Action Menu

The Item Simulation Action drop-down menu has four options:

View Menu

Using the View drop-down menu, you can choose the columns you want to display and the order in which they appear in the table. You can also sort their sequence.

Layout Configuration

You can choose the columns to display, the order in which they appear in the table and the sort sequence by selecting the appropriate option in the View menu, described above. Your changes persist across sessions as a user profile until you change them. The layout configuration is saved automatically.

Context of the Item Simulation Set and Plan

The item simulation set name that is associated with the selected plan is passed in as context and appears in the Simulation Set Name in the search panel. You can then further refine what items you wish to see by modifying the search fields, using the drop-down menus in the Search fields. You can also select to view a different item simulation set by changing the name of the Item Simulation Set in the Simulation Set field of the Search pane.

Navigating to the Item Simulation Set

You can select the Item Simulations Set link from either the Plan Health Summary or Demand and Supply pages of the Supply Chain Analyst dashboard. In the ASCP Plan Actions pane of your screen, you can choose the plan you want to carry into context in ASCP.

Note: Archived plans are not available for selection.

the picture is described in the document text

As soon as you select the Item Simulation Set link, the item simulation set dialog appears.

Accessing and Editing Item Simulation Sets

To access an item simulation set:

  1. Click the Plan Health Summary tab or the Demand and Supply tab of the APCC dashboard.

  2. Scroll to the bottom of your page and select the desired plan, either baseline or comparison.

  3. From the ASCP Plan Actions box, select Item Simulation Set.

To edit an item simulation set:

  1. Choose the simulation set you want from the Simulation Set drop-down list.

  2. To insert a row in the Item Simulation set, click Add in the Item Simulation Set window.

    The system inserts a row at the top of the table where you can then enter the desired organization/item combination.

    the picture is described in the document text

    You can edit an item and attribute directly in the table or you can edit multiple items and attributes using mass edit.

  3. To edit several items and attributes at once, select the items you want to change using Ctrl/Shift and click Mass Edit in the table toolbar above the Org/Item columns.

    You cannot edit the Org/Item columns; however you can edit the other item attributes, which are listed across the top of your Simulation Set. Click the attribute field corresponding to the Organization or Item you want to change and enter a new value or choose a value from the drop-down menu.

    the picture is described in the document text

Mass Editing in the Item Simulation Set

Using the Mass Edit function in the Item Simulation Set window, you can change several attributes at once.

To mass edit in an Item Simulation Set

  1. From the Item Simulation Set window, select the rows you want to change. To select more than one row, press Ctrl/Shift.

  2. Click Mass Edit, located in the Item Simulation Set window toolbar.

    the picture is described in the document text

  3. The Item Simulation Set Mass Edit window displays the number of rows you chose in Step 1. The columns of the window are explained in the table below:

    Column Description
    Attribute Name You can select any of the item attributes that are editable.
    Update Action Determines the type of update to be made. Valid Values are:
    • Set Value To

    • Increase by Value

    • Increase by Percentage

    • Decrease by Value

    • Decrease by Percentage

    • Set Original Value

    Attribute Value The value the attribute is overridden to, or increased/decreased, depending on the update action.
    When update action is to Set Original Value, you cannot enter an attribute value.
  4. Press Apply and Close if you are satisfied with your changes. Otherwise, press Clear to redo your changes or Cancel to close the window without making changes.

Using the Exceptions Page

This section provides an overview of the Exceptions page and discusses:

Understanding the Exceptions Page

The Exceptions page enables the supply chain analyst to analyze exceptions in a current plan and compare those exceptions against a comparison plan.

the picture is described in the document text

Page Level Filters

Page level filters are provided at the top of the page to filter the results of all reports.

This table lists the page level filters for the Exceptions page:

Filter Description
Comparison Plans Select from a list of comparison plans. Multiple plans can be selected. This is a required field.
Baseline Plan Select from a list of plans to use as a baseline. Only one plan can be selected. This is a required field.
Category Select from a list of categories. Multiple organizations can be selected. This is an optional field.
Organization Select from a list of organizations. Multiple organizations can be selected. This is an optional field.
Period Start Select from a list of date and time selections. Select from a range of dates and times. This is an optional field.

Exceptions Summary

The Exceptions Summary reports enable the user to analyze exceptions in the baseline plan and compare exceptions between the baseline and comparison plans. The Exceptions Summary report consists of seven subreports:

To view the Exceptions Summary reports, see Understanding the Exceptions Page.

Additional reports that you can access from the Exceptions Summary reports are (listed in alphabetical order):

Exceptions Summary by Category

The Exceptions Summary by Category report enables the user to analyze exceptions based on an item category in the baseline plan and also compare exceptions between the baseline and comparison plans for an item category.

the picture is described in the document text

In addition to the page-level filters at the top of the page, users can specify these filters for the report:

Field Description
Measure Select how you want to view the exception measure. Options include Exception – Days, Exception – Quantity, Exception – Ratio, Exception – Value, Exception – Count.
Exception Type Select an exception type. Options include Early replenishment for forecast, Items with a shortage, and so on.

Additional reports that you can access from the Exceptions Summary by Category report are (listed in alphabetical order):

Exceptions Summary by Organization

The Exceptions Summary by Organization report enables the user to analyze exceptions based on an organization in the baseline plan and also compare exceptions between the baseline and comparison plans.

the picture is described in the document text

In addition to the page level-filters at the top of the page, users can specify these filters for the report:

Field Description
Measure Select how you want to view the exception measure. Options include Exception – Days, Exception – Quantity, Exception – Ratio, Exception – Value, Exception – Count.
Exception Type Select an exception type. Options include Early replenishment for forecast, Items with a shortage, and so on.

Additional reports that you can access from the Exceptions Summary by Organization report are (listed in alphabetical order):

Rescheduled Orders by Suppliers

The Rescheduled Orders by Suppliers report enables the user to analyze the number of rescheduled orders by days for suppliers.

By default the report displays the top 10 suppliers. Using the MSC: Value of N for all top/bottom-N reports in Dashboards profile, users can adjust the number of top suppliers displayed.

To view the Rescheduled Orders by Suppliers report, see Understanding the Exceptions Page.

In addition to the page-level filters at the top of the page, users can specify this filter for the report:

Field Description
View Select how you want to view the report. Options include Chart and Table.
The Chart view plots rescheduled orders in days for suppliers using a bar graph. The Table view provides the values that correspond to the Chart view.

An additional report that you can access from the Rescheduled Orders by Suppliers report is the Exceptions Trend report.

Rapid Planning Exception Report Drill Downs

The Exceptions Report in Rapid Planning is accessible from the following APCC reports:

The context that needs to be passed to Rapid Planning is one of the following:

For details on each report, refer to the Supply Chain Analyst Dashboard section of this document

Note: These drill-downs are also applicable to ASCP Plans in the SCA dashboard in which case it the drilldown is to the ASCP workbench.

Understanding Plan Details

The Exceptions tab of the Supply Chain Analyst Dashboard is similar to the Plan Health Summary tab. It is driven by the following measures:

You can drill down to Plan Details from any performance tile. This will pass the measures from the dashboard prompts to the Plan Details tab.

In the following explanations, online informational tiles are represented in colors. In the documentation, the tiles are represented by textures as follows:

the picture is described in the document text

You can customize these conditional formatting using the standard OBIEE personalization capabilities.

Measure Red Green
Shortages >100 < or = 100
Resource Overloads >100 < or = 100
Cancellations >100 < or = 100
Late Order Value >1,000,000 < or = 1,000,000
Reschedule In >100 < or = 100
Reschedule Out >100 < or = 100
Supply Capacity Overloads >100 < or = 100

The exception performance tile measures are calculated as follows:

the picture is described in the document text

Using the Historical Performance Page

This section provides an overview of the Historical Performance page and discusses:

Understanding the Historical Performance Page

The Historical Performance page enables the supply chain analyst to analyze the performance of the supply chain from one period to another. The user can compare the historical performance of a baseline plan to plans from previous periods.

the picture is described in the document text

Page-Level Filters

Page-level filters are provided at the top of the page to filter the results of all reports.

This table lists the page-level filters for the Historical Performance page:

Filter Description
Archived Plan Select from a list of archived plans. Only one plan can be selected.
Period Start Select from a list of date and time selections. A range of date and time can be selected.

Overall Supply Chain Performance Metrics

The Overall Supply Chain Performance Metrics report enables users to analyze performance metrics in one manufacturing period or two manufacturing periods.

To view the Overall Supply chain Performance Metrics report, see Understanding the Historical Performance Page

In addition to the page-level filters at the top of the page, users can specify this filter for the report:

Field Description
Manufacturing Period Start Date Select a date to analyze or compare.

Additional reports that you can access from the Overall Supply Chain Performance Metrics report are (in alphabetical order):

Supply Chain Metrics Trend

The Supply Chain Metrics Trend report enables users to analyze the trends of key supply chain metrics and how these metrics are expected to perform in the future given a specific plan.

The report indicates how each supply chain metric has been performing against a plan value in the past and in the future. The report displays any metric that has a significant deviation between periods.

the picture is described in the document text

In addition to the page-level filters at the top of the page, users can specify this filter for the report:

Field Description
View Select how you want to view the report. Options include Time Trend Chart and Time Trend Table.
The Chart view plots inventory value, resource utilization, planned shipments, and planned production in a combination of line graphs and bar charts over time. The Table view provides the values that correspond to the Chart view.

Additional reports that you can access from the Supply Chain Metrics Trend report are (in alphabetical order):

Inventory Value by Categories

The Inventory Value by Categories report enables users to analyze inventory performance in the baseline plan. Inventory performance is displayed in terms of projected available balance at the end of a period as a monetary value.

By default, the report displays the top 10 categories with the most inventory. Using the MSC: Value of N for all top/bottom-N reports in Dashboards profile, the user can adjust the number of top categories displayed.

the picture is described in the document text

In addition to the page-level filters at the top of the page, users can specify this filter for the report:

Field Description
View Select how you want to view the report. Options include Chart and Table.
The Chart view plots inventory value for each category using a bar graph. The Table view provides the values that correspond to the Chart view.

Additional reports that you can access from the Inventory Value by Categories report are (in alphabetical order):

Days of Cover by Categories

The Days of Cover by Categories report enables users to analyze inventory performance in the baseline plan. Inventory performance is displayed in terms of projected available balance at the end of a period as days of cover.

By default, the report displays the top 10 categories. Using the MSC: Value of N for all top/bottom-N reports in Dashboards profile, the user can adjust the number of top categories displayed.

the picture is described in the document text

In addition to the page-level filters at the top of the page, users can specify this filter for the report:

Field Description
View Select how you want to view the report. Options include Chart and Table.
The Chart view plots inventory days of cover for each category using a bar graph. The Table view provides the values that correspond to the Chart view.

Additional reports that you can access from the Days of Cover by Categories report are (in alphabetical order):

Production to Plan by Categories

The Production to Plan by Categories report enables users to analyze the planned production for each category for a specific plan.

By default, the report displays the bottom 10 categories with lowest production to plan. Using the MSC: Value of N for all top/bottom-N reports in Dashboards profile, the user can adjust the number of categories displayed.

To view the Production to Plan by Categories report, see Understanding the Historical Performance Page

In addition to the page-level filters at the top of the page, users can specify this filter for the report:

Field Description
View Select how you want to view the report. Options include Chart and Table.
The Chart view plots planned production for each category using a bar graph. The Table view provides the values that correspond to the Chart view.

An additional report that you can access from the Production to Plan by Categories report is the ASCP Workbench – Exception Details report.

Shipments to Plan by Categories

The Shipments to Plan by Categories report enables users to analyze the planned shipments for each category for a specific plan.

By default the report displays the bottom 10 categories with lowest shipments to plan. Using the MSC: Value of N for all top/bottom-N reports in Dashboards profile, the user can adjust the number of categories displayed.

the picture is described in the document text

In addition to the page-level filters at the top of the page, users can specify this filter for the report:

Field Description
View Select how you want to view the report. Options include: Chart and Table.
The Chart view plots planned shipments for each category using a bar graph. The Table view provides the values that correspond to the Chart view.

An additional report that you can access from the Shipments to Plan by Categories report is the ASCP Workbench – Exception Details report.

Resource Utilization by Resource Groups

The Resource Utilization by Resource Groups report enables users to analyze resource utilization for the resource groups within a plan.

By default, the report displays the top 10 resource groups. Using the MSC: Value of N for all top/bottom-N reports in Dashboards profile, the user can adjust the number of resource groups displayed.

the picture is described in the document text

In addition to the page-level filters at the top of the page, users can specify this filter for the report:

Field Description
View Select how you want to view the report. Options include Chart and Table.
The Chart view plots resource utilization for each resource group using a bar graph. The Table view provides the values that correspond to the Chart view.

An additional report that you can access from the Resource Utilization by Resource Groups report is the Resource Utilization Trend report.

Using the Scenario Analysis Page

This section provides an overview of the Scenario Analysis page and discusses:

Understanding the Scenario Analysis Page

The Scenario Analysis page enables the supply chain analyst to analyze key metrics in the supply chain over time and how they vary from one scenario to another. The key metrics that are displayed are:

the picture is described in the document text

Page-Level Filters

Page-level filters are provided at the top of the page to filter the results of all reports.

This table lists the page-level filters for the Scenario Analysis page:

Filter Description
Comparison Scenario Select from a list of plans that are to be used to compare to the baseline plan. Multiple plans can be selected. This is a required field.
Baseline Plan Select from a list of plans that are to be used as the baseline plan. Only one plan can be selected. This is a required field.
Category Select from a list of categories. Multiple categories can be selected. This is an optional field.
Resource Group Select from a list of resource groups. Multiple resource groups can be selected.
This filter applies only to the resource- related reports on the page such as Resource Measures, Resource Trend Over Time, and Resource Exceptions Summary. This is an optional field.
Organization Select from a list of organizations. Multiple organizations can be selected. This is an optional field
Period Start Select from a list of date and time selections. A range of dates and times can be selected. This is an optional field.

Scenario Summary Report

The Scenario Summary report is similar to the Executive Summary report on the SOP Dashboard. It contains a summary of the demand and supply metrics for the scenario, including:

Filters

Filter set for prompts for Scenario Analysis page include both the prompted comparison Scenarios and the Baseline Scenario Presentation variable SCABScenarioPV.

From the Scenario Summary Report, you can drill down to the numerous reports using the default filtering from the analysis dashboard page level prompts. At the same time, you can enable interactive changing of the prompts to further filter down the selection or expand the selection.

The table below shows the drilldown reports you can access from the Scenario Summary report and the field values from which you drill down.

From Field Value Drilldown Report
Constrained Forecast Value Demand Pegging - Units
Demand Pegging - Value
Shipment History Value Bookings Performance - Units
Bookings Performance - Value
Shipment Performance - Units
Shipment Performance - Value
Actual Backlog Value Backlog Analysis – Units
Backlog Analysis – Value
Sales Order Value Sales Order Analysis - Units
Sales Order Analysis - Value
Current Shipment Plan Current Shipment Plan

Demand Pegging - Units Report

The Demand Pegging - Units report is viewed by drilling down from the Constrained Forecast Value field in the Scenario Summary Report. It provides information about the following:

The following measures are available from the Demand Pegging – Units report:

Filters

The filters are the Supply Chain Analyst (SCA) Scenario prompts.

Views

The views are:

You can view the Pivot table by the following criteria:

Demand Pegging - Value Report

The Demand Pegging - Value report is viewed by drilling down from Constrained Forecast Value field in the Scenario Summary Report. It provides information about the following:

The following measure are available from the Demand Pegging - Value report:

Filters

The filters are the SCA Scenario prompts.

Views

The Pivot table is viewed by the following criteria:

Bookings Performance – Units Report

The Bookings Performance – Units report is view by drilling down from the Shipment History – Value field of the Scenario Summary report. It provides information about the following:

The following measures are available from the Booking Performance - Units report:

Filters

The filter is set from the SCA dashboard, Scenario Analysis.

Views

The views are:

The Pivot table is viewed by the following criteria:

Bookings Performance – Value Report

The Bookings Performance – Value report is view by drilling down from the Shipment History – Value field of the Scenario Summary report. It provides information about the following:

The following measures are available from the Booking Performance - Units report:

Filters

The filter is set from the SCA dashboard, Scenario Analysis.

Views

The views are:

The Pivot table is viewed by the following criteria:

Shipment Performance - Units Report

The Shipment Performance - Units report is viewed by drilling down from the Shipment History Value field in the Scenario Summary Report. It provides information about the following:

The following measures are available from the Shipment Performance – Units report:

Filters

The filters are set from the SCA dashboard, Scenario Analysis.

Views

The views are:

The Pivot table is viewed by the following criteria:

Shipment Performance – Value Report

The Shipment Performance - Value report is viewed by drilling down from the Shipment History Value field in the Scenario Summary Report. It provides information about the following:

The following measures are available from the Shipment Performance – Value report:

Filters

Filters are set from the SCA dashboard, Scenario Analysis.

Views

The views are:

The Pivot table is viewed by the following criteria:

Backlog Analysis - Units Report

The Backlog Analysis - Units report is viewed by drilling down from the Backlog Value field in the Scenario Summary Report. . It provides information about the following

The Actual Backlog measure is available from the Shipment Performance – Value report.

Filters

The filters are set from the SCA dashboard, Scenario Analysis.

Views

The views are:

The Pivot table is viewed by the following criteria:

Backlog Analysis – Value Report

The Backlog Analysis – Value report is viewed by drilling down from the Backlog Value field in the Scenario Summary Report. It provides information about the following:

The Actual Backlog - Value Reporting Currency measure is available from the Shipment Performance – Value report.

Filters

Filter are set from the SCA dashboard, Scenario Analysis.

Views

The views are:

The Pivot table is viewed by the following criteria:

Sales Order Analysis – Units

The Sales Order Analysis – Units report is viewed by drilling down from Sales Order Value field in the Scenario Summary Report. It provides information about the following:

The following measures are available from the Sales Order Analysis - Units report:

Filters

The filters are set from the SCA dashboard, Scenario Analysis.

Views

The views are:

The Pivot table is viewed by the following criteria:

Sales Order Analysis – Value Report

The Sales Order Analysis – Value report is viewed by drilling down from Sales Order Value field in the Scenario Summary Report. It provides information about the following:

The following measures are available from the Sales Order Analysis - Units report:

Filters

Filters are set from the SCA dashboard, Scenario Analysis.

Views

The views are:

The Pivot table is viewed by the following criteria:

Current Shipment Plan Report

The current shipment plan measure combines period to date shipment history and sales orders (backlog) scheduled to ship in the period. It expresses how much of the forecast or revenue target is already covered by booked orders that may or may not have yet shipped. A comparison of this measure to the forecast becomes how much is “left to book” to meet the forecast.

The Current Shipment Plan report is viewed by drilling down from the Current Shipment Plan in the Scenario Summary Report. It provides information about the following:

The following measures are available from the Current Shipment Plan report:

Filters

The filters are the SCA Scenario Analysis prompts.

Views

The views are:

Demand Pegging – Baseline Plan Report

The Demand Pegging - Baseline Plan report provides information about the scenario.

An example of the Demand Pegging - Baseline Plan report is shown below:

the picture is described in the document text

Filters

The filters are the SCA Scenario prompts that are adjusted to select the Baseline Scenario.

Views

The views are:

Left to Book by Quarter Report

The Left to Book by Quarter report provides information about the following:

The following measures are available from the Left to Book by Quarter Report:

Filters

The filters are SCA Scenario prompts, adjusted to prompted Baseline Scenario.

Views

The views are:

Plans Report

The Plans report provides information about:

Filters

The filters capture prompted comparison scenarios and prompted baseline scenario.

Views

The views are:

Demand and Supply Summary Report

The Demand and Supply Summary report on the Scenario Analysis page is exactly like the Demand and Supply Summary report on the Demand and Supply page with one exception. The former enables the user to determine how demand and supply is different between a baseline and comparison scenario.

See Demand and Supply Summary

Demand and Supply Trend Across Scenarios Report

The Demand and Supply Trend Across Scenarios report on the Scenario Analysis page is similar to the Demand and Supply Trend Across Plans report on the Demand and Supply page with one exception. The former report enables the user to evaluate the trends of demand and supply over time and whether the trends change between the baseline and comparison scenarios.

See Demand and Supply Trend Across Plans

Navigations:

From Total Demand:

From Total Supply

Supply Utilization – Units Report

The Supply Utilization – Units report provides information about:

The following measures are available from the Supply Utilization – Units report:

Filters

The filters are the SCA Scenario prompts expressed as filters.

Views

The views are:

You can view the Pivot table by the following criteria:

Supply Utilization – Value Report

The Supply Utilization – Value report provides information about the following:

The following measures are available from the Supply Utilization – Value report:

Filters

The filters are the SCA Scenario prompts.

Views

The views are:

The Pivot table can be viewed by the following criteria:

Resource Summary Report

The Resource Summary report on the Scenario Analysis page is exactly like the Resource Summary report on the Resources page with one exception. The former enables the user to determine how resource utilization varies between baseline and comparison scenarios.

See Resource Summary

Resource Utilization Trend Report

The Resource Utilization Trend report on the Scenario Analysis page is exactly like the Resource Utilization Trend report on the Resources page with one exception. The former enables the user to determine how resources are used over time and whether the trend has changed between baseline and comparison scenarios.

See Resource Utilization Trend

Exception Summary

The Exception Summary report on the Scenario Analysis page is exactly like the Exception Summary report on the Exceptions page with one exception. The former enables the user to analyze exceptions in the baseline scenario and compare exceptions between the baseline and comparison scenarios.

See Exceptions Summary

Using the Inventory Analysis Page

The Inventory Analysis page allows supply chain analysts to efficiently evaluate how inventory attributes and parameters vary from plan to plan and within a plan. You can make inventory decisions using APCC. All reports are provided in the reporting currency.

All reports are provided in the reporting currency.

An example of the top portion of the Inventory Analysis page is shown below. Addition reports are available by scrolling down the page.

the picture is described in the document text

Page-Level Filters

Page level filters are provided at the top of the page to filter the results of all reports.

This table lists the page-level filters for the Inventory Analysis page.

Filter Description
Baseline Plan Select from a list of plans that are to be used as the baseline plan. Only one plan can be selected. This is a required field.
Comparison Plan Select from a list of plans that are to be used to compare to the baseline plan. You can select multiple plans from this list.
Category Select from a list of categories. Multiple categories can be selected. This is an optional field.
Organization Select for a list of organizations. Multiple organizations an be selected. This is an optional field.
Week Start Select from the date range of choice over which the reports are displayed.

Inventory Analysis Page Reports

The following diagram shows the reports available in the Inventory Analysis Page and their relationship to each other.

the picture is described in the document text

Inventory Performance Summary Report

The inventory performance summary page helps users understand the investment required to achieve a given service level and the profit that is derived from it. The following measures provide this information:

You can view the Inventory Performance Summary report as a table, bubble graph, or chart.

From the Inventory Summary Report, you can drill down to the following reports:

Drilldown reports are sorted by Service level shortfall, but display all categories. The Difference in service levels is given as a percentage and calculated as:

{Target Service Level – Achieved Service Level}

The graph on the Inventory Analysis page is for the Baseline Plan and the report on the dashboard page is Top-N.

Inventory Measures Trend Report

This report help analyze inventory performance using key measures of Safety Stock and Service Level. This helps users understand if achieved service level is tracking to target service level and if projected available balance is tracking to safety stock.

The report can be viewed as a table or a chart.

In generating the Inventory Measure Trend report, note the following:

An example of the Inventory measures Trend report is shown below:

the picture is described in the document text

Inventory Quantity (Value) by Category Report and Inventory Quantity (Value) by Organization Report

These two reports are drill downs from the Inventory Performance Summary report and provide inventory information for a given plan. From either one of these plans, you can drill down to the Comparison of Inventory Quantity (Value) and Safety Stock.

If the drill down is from Inventory Quantity (Value) by Category report, then the resulting report is the Inventory Quantity and Safety Stock Comparison for the specific category across organizations.

If the drill down is from Inventory Quantity (Value) by Organization report, then the resulting report is the Inventory Quantity and Safety Stock Comparison for all categories in the specific organization.

Inventory Quantity (Value) as a drilldown report brings up both the Inventory Quantity (Value) by Category and Inventory Quantity (Value) by Organization reports. These are not Top-N reports.

Service Level Short Fall by Category Report

The Service Level Short Fall by Category report details the Top N categories that have the greatest difference between Achieved Service Level and Target Service Level for a given plan.

This report is a drill down from the Inventory Performance Summary report. It applies to a given plan. From this report, you can drill down to the Inventory Measures Trend by Category-Organization report, which displays information for a given plan or organization.

Some points to note when using this report are:

An example of a Service Level Shortfall by Category report is shown below:

the picture is described in the document text

Inventory Budget Excess by Category Report

This report details the Top-N categories with the most difference between Budget and Inventory Value (Average Projected Available Balance (reporting currency) over the desired period). It helps business users understand which categories have either exceeded their budget or are way below their assigned budget values.

This report is a drill down from the Inventory Performance Summary report. An example of the report is shown below:

the picture is described in the document text

Comparison of Inventory Quantity (Reporting Currency) and Safety Stock

This report, generated for selected categories and organizations, helps you compare inventory to safety stock in value, days of cover and quantity. The report also displays a Ratio, which is useful in determining if there is adequate inventory available to meet Safety Stock. The Ratio is sorted in ascending order.

Note: Safety Stock that is used in this table is the value of the first bucket.

This report is a drill down from the Inventory Quantity (Value) by Category and the Inventory Quantity (Value) by Organization reports. You can drill down from this report to the Item-Organization level by using the inherent hierarchy of the model.

Safety Stock Postponement Analysis Report

This report details material positioning for across plans. It helps business users understand how much organizations have saved in terms of carrying cost and cost of inventory in using postponement.

From this report, you can drill down to Safety Stock Postponement Analysis by Category report and the Safety Stock Postponement Analysis by Organization report.

An example of the Safety Stock Postponement Analysis report is shown below:

the picture is described in the document text

Safety Stock Postponement Analysis by Organization Report

This report details material positioning for a given plan across organizations. It helps users understand how much organizations have saved in terms of carrying cost and cost of inventory in using postponement.

Savings is calculated as:

Measure without Postponement – Measure with Postponement

This report is a drill down from the Safety Stock Postponement Analysis report. There are no drill downs from this report.

Build Plan Report

The Build Plan report is part of Demand Fulfillment tab in the Supply Chain Analyst Dashboard. It uses the End Item Dimension to provide insight to planners. This report provides the ability to analyze measure by End Item, which shows the quantities for each component item across all end items.

Four measures covered in the report are:

the picture is described in the document text

Order Details Report

As part of your analysis, you can display contextual Order. APCC supports order details as a new Measure Group called Order Details, in which order attributes are exposed as measures. You can access this report as a contextual drill-down from the Build Plan report.

The report shows the list of attributes along with their relevance to Supplies only, Demands only, or both Supplies and Demands.

the picture is described in the document text

Click Total Supply or Total Demand in the Build Plan report. Order Details refreshes and display the orders for that specific context of Item, Org, and Week based on all the dates that fall in that week according to the Sugg Due Date.

Supply Chain Analyst Secondary Drill-Down Reports

Primary reports are located on the six tabs in the Supply Chain Analyst Dashboard: Plan Health Summary, Demand and Supply, Resources, Exceptions, Historical Performance, and Scenario Analysis.

Secondary drill-down reports are reports that are accessed from the primary reports. They are often displayed in the context of where the user is drilling down from in the primary report. That is, if the user drills down from a data point in the primary report that displays the value for a product category, then the secondary report is displayed for that product category.

This table lists secondary reports for the Supply Chain Analyst Dashboard in alphabetical order:

Report Name Measures or Facts Dimension or View by
Aggregate Horizontal Plan Total demand, total supply, safety stock, and projected available balance (PAB) – units Plan
Days of Cover by Items Exception count (use alternate sources or use alternate suppliers) and safety stock violations Plan or Period
Days of Cover by Organizations Days of cover Organization
Demand and Supply Totals by Category Total demand, forecast sales orders, past-due backlog quantity, total supply, on hand, days of cover, and scheduled receipts Category
Demand and Supply Totals by Organization Total demand, forecast sales orders, past-due backlog quantity, total supply, on hand, days of cover, and scheduled receipts Organization
Detailed Horizontal Plan Total demand, forecast, sales order, total supply, on hand, scheduled receipts, planned orders, safety stock, PAB – units Plan
Exceptions by Categories Based on the exception type that the user selects to drill down to the trend report, which is one of: Exception Count (stock outs, use alternate sources, or use alternate suppliers), Exception Days (late sales orders, rescheduled orders), Exception Value (late sales orders), Exception Quantity (late forecast), or Safety Stock Violations Category
Exceptions by Customers Based on the exception type that the user selects to drill down to the trend report, which is one of: Exception Days (late sales orders, rescheduled orders), Exception Value (late sales orders), or Exception Quantity (late forecast) Customer
Exceptions by Items Based on the exception type that the user selects to drill down to the trend report, which is one of: Exception Count (stock outs, use alternate sources, use alternate suppliers), Exception Days (late sales orders, rescheduled orders), Exception Value (late sales orders), Exception Quantity (late forecast), or Safety Stock Violations Item
Exceptions by Organizations Based on the exception type that the user selects to drill down to the trend report, which is one of: Exception Count (stock outs), Exception Days (late sales orders, rescheduled orders), Exception Value (late sales orders), Exception Quantity (late forecast), or Safety Stock Violations Organization
Exceptions by Suppliers Based on the exception type that the user selects to drill down to the trend report, which is one of: Exception Count (use alternate sources and use alternate suppliers), or Exception Days (rescheduled orders) Supplier
Exceptions Trend Based on the exception type that the user selects to drill down to the trend report, which is one of: Exception Count (stock outs, user alternate sources, or use alternate suppliers), Exception Days (late sales orders or rescheduled orders), Exception Value (late sales orders), Exception Quantity (late forecast or resource overload), or Safety Stock Violations Exception type
Least Utilized Resources Resource availability, resource requirement, or resource utilization Resources
Most Utilized Resources Resource availability, resource requirement, or resource utilization Resources
Production to Plan by Organization Production to plan Organization
Resource Utilization Trend Resource availability, resource requirement, or resource utilization Plan
Resource Utilization by Department Resource availability, resource requirement, or resource utilization Department
Resource Utilization by Organizations Resource availability, resource requirement, or resource utilization Organization
Resource Utilization by Resource Groups Resource availability, resource requirement, or resource utilization Resource Group
Shipments to Plan by Organization Shipments to plan Organization
WIP (work in progress) Start by Organizations WIP start quantity Organization

The following forms in the ASCP application are accessible from the supply chain analyst dashboard:

My Open Activities

When you are logged on, the two seeded dashboards, the Supply Chain Analyst dashboard and the Sales & Operations Planning Analyst dashboard, display an alert in the top right of the page whenever overdue open activities exist. This is based on a seeded iBot that is tied to a report called My Open Activities. When you click the alert icon, the My Open Activities table displays a complete list of all open activities for which you are the primary or secondary owner.

When you click an activity name in the My Open Activities table, the activities table in the Scenario management user interface opens and displays all the details of the activity. In this location, you can update the status, owner, and other details of the activity.

See Working with Activities Working with Activities in Chapter 2 for an understanding of planning activities.

Using the Projects Supply Chain Page

Projects Supply Chain page of the Supply Chain Analyst dashboard enhances the integration of APCC with ASCP. It lets you evaluate supply performance against the objective of meeting project deliverables. You can analyze:

You can also drill down to related information if you need to perform more in depth analyses and perform corrective actions.

the picture is described in the document text

Project Supply Chain Content

The Projects Supply Chain tab displays five panes:

Project Performance Summary

The Projects Performance summarizes the demand satisfaction information at the Project level. It tells you the cost of the project and the number of orders in the project. It also shows the number of projects that are late and by how many days they are late.

The Baseline plan is in the first column.

This summary supports the following drill-downs from Orders (Total) and Orders (Late):

the picture is described in the document text

Column Description
Project Shows your selected projects if you apply a project filter. If you do not select a filter, the table displays all projects. If you select a project and there are no demands in it or the baseline plan, the project is not displayed.
On Time Valid values are:
  • Yes: All demands are satisfied.

  • No: One or more demands is late.

Days Late Max(Days Late) of all the demands of this project
Project Cost SUM { demand quantity * item standard cost } of all the demands in this project
Orders (Total) COUNT { all demands of this project }
Orders (Late COUNT { all late demands of this project }

Drill Down Reports

Order Details

The Order Details report has changed from a dashboard page to a drill-down. The report is used to enable a drill-down from the Project Performance Summary report. The report has the following prompts:

the picture is described in the document text

Demands and Supplies by Order Type

This drill-down displays the supplies and demands for a specific project/plan combination by Org, Category, and Order Type. There are no additional drill-downs from this report.

the picture is described in the document text

Exceptions Summary by Project

The Exceptions Summary by Project is a graph that summarizes the count of exceptions by exception type for selected projects. The following exception types are included:

The Exception Summary Count by Project report supports the following drill-downs from any bar:

the picture is described in the document text

Top Late Demands (by Value)

The Top N Late Demands (by value) table displays the top N late demands in decreasing order of Order Value and then Days Late. The Top N value is set by the profile MSC: Value of N for all top/bottom-N reports in Dashboards, (MSC_HUB_TOP_BOTTOM_N_Value). In the screen shown, N=10.

the picture is described in the document text

This table supports and Order Value drill-down, which displays the ADF based Orders screen. The screen displays end demand and all pegged supplies of that demand in the ASCP Supplies and Demands screen. You can hide or show additional columns in the Orders screen so you can perform specific analyses.

Top Late Purchase Orders (by Days Late)

The Top Late Purchase Orders (by Days Late) shows the purchase orders in the plan whose Suggested Due Date is greater than Need by Date. The report, which filters by the baseline, sorts the results in descending order of Days Late where Days Late = Suggested Due Date – Need by Date.

The top N value is set in the profile MSC: Value of N for all top/bottom-N reports in Dashboards (MSC_HUB_TOP_BOTTOM_N_Value).

There are no drill downs from this report.

the picture is described in the document text

Resource Utilization Summary

The Resource Utilization Summary shows the most utilized resources in the plan in decreasing order of resource utilization. It does not filter on projects. You can toggle between a table or graph display.

Note: This report is identical to the one on the Most Utilized report on the Resource tab of Supply Chain Analyst. The project filter will not apply to resource utilization.

New Reports in the Supply Chain Analyst Dashboard

The Supply Chain Analyst Dashboard has six new reports under different tabs or reports. They are described in the following sections.

New Reports in Plan Health Summary

Plan Health Summary has the following new reports:

Purchasing Cost by Period

The Purchasing Cost by Period report displays all the planned purchases by manufacturing period. It is filtered to include the baseline and comparison plans.

The report contains the following details:

the picture is described in the document text

Days on Hand of Cover

This report displays a summary view of days of cover. You can show your results as a chart or a graph by means of a graph prompt. It contains the following details:

The report contains the following details:

the picture is described in the document text

Revenue by Period

Revenue by Period report shows revenue by period.

The report contains the following details:

the picture is described in the document text

New Reports in Resources

The Resources tab has the following new reports:

Resource Utilization by Resource

This report displays utilization by resource.

Note: Organization is a graph prompt and resource description is a section displayed as a slider.

The report contains the following details:

the picture is described in the document text

Planned Production by Organization

This report displays planned production by category by organization. The Plan is a graph prompt and organization is a section displayed as a slider.

The report contains the following details:

the picture is described in the document text

New Reports in Demand and Supply

The Demand and Supply has a new Planned Purchases by Supplier report.

This report displays planned purchases by period. It is filtered to include the baseline and comparison plans. It is also filtered to include only those order types of purchase order, purchase requisition and planned order where the supplier is not null. Orders with the supplier unassigned are also filtered out.

The report contains the following details:

the picture is described in the document text