Generating Load Plans

When you generate a load plan, the load plan is built in the ODI Repository. A load plan must be successfully generated before it can be executed.

Load plans must be generated serially, otherwise the process fails. Do not launch a second load plan generation if one is already underway. You must wait until the first generation process completes before you launch the next generation process.

To generate load plans:

  1. In the Tasks pane of Configuration Manager, select Manage Load Plans under Load Plans Administration.

    The Manage Load Plans page is displayed.

  2. In the Load Plans master list, select the load plan you want to generate.
  3. In the Load Plans toolbar, click the Generate icon.

    The possible icons that are displayed in the Generation Status column of the Load Plan master list are described in the following table. Click the Refresh icon to refresh the display.

    Generation Status Icon Description
    This graphic is described in the surrounding text.

    Starting

    This graphic is described in the surrounding text.

    In Progress

    This graphic is described in the surrounding text.

    Succeeded

    This graphic is described in the surrounding text.

    Failed

You can execute a load plan or schedule it for execution after it has been successfully generated.