Operation Times Calculations
The operation times calculations are based on resources in the Flow Routing with the following criteria:
- The resource is scheduled.
The system takes the sum of all usage rates for resources that meet the above criteria in the Flow Routing. If the resource basis is lot, the system will temporarily convert the basis to item before calculating the operation times.
See Also
Calculating Operation Times
Creating a Flow Routing