Previous  Next          Contents  Index  Navigation  Glossary  Library

CRP Rate-Based Report

The CRP Rate-Based Report displays detailed capacity information for repetitively planned items manufactured on rate based lines for a selected material requirements plan. You can display the report information in a combination of weekly and periodic buckets. You can report on lines where percent of utilization falls below or exceeds a specified percentage. You can report capacity information on all production lines, a range of lines, or a specific line. You can optionally include requirements details that displays each resource requirement along with information pertaining to the source of the requirement.

Note: You can launch this report from Master Scheduling/MRP and Oracle Supply Chain Planning modules.

Report Submission

In the Submit Requests window, enter CRP Rate-Based Report in the Name field.

Report Parameters

Plan Name

Enter an MRP plan name for which you want to report a capacity requirements plan.

Periods

Choose one of the following time periods:

12 Report the capacity plan for 12 periods.
24 Report the capacity plan for 24 periods.
36 Report the capacity plan for 36 periods.
48 Report the capacity plan for 48 periods.

Weeks

Enter the number of weeks. Together with the number of periods you chose, this determines how many weeks and how many months appear in the report.

For example, suppose you choose 24 periods and 10 weeks. Oracle Capacity displays 10 of the 24 periods on the report as weeks and the remaining 14 periods as months.

This field presents as valid choices only those values that insure whole month buckets in the rest of the report. For example, suppose your organization calendar has a 445 weekly quarter pattern, and that the current date falls in the third week of the first period in the quarter. Oracle Capacity presents only those values that correspond to the end of future months; thus, you see choices for 1 (end of current month) 5 (end of next month) and 10 weeks (end of quarter.)

Include Costs

Choose one of the following options:

No Do not display the standard cost of each resource.
Yes Display the standard cost of each resource. Display the cost estimate for each period, equal to the resource cost times the total requirements for a period; plus any applicable department overhead.

Include Requirements Detail

Choose one of the following options:

Yes Include the vertical requirements listing. This listing displays each resource requirement along with information on the MRP source of the requirement.
No Do not report the vertical requirements listing.

Low Utilization Percent

Enter a percentage to use as the minimum percent cutoff.

High Utilization Percent

Enter a percentage to use as the maximum percent cutoff.

Line From/To

To restrict the report to a range of production lines, select the beginning and ending production lines.

Horizontal Display Factor

Enter a space saving factor by which all numbers in the horizontal listing section are divided by. For example, if the horizontal display factor is 100, 1050.25 is displayed as 1050. Oracle Capacity displays 1 as the default.

See Also

Defining MRP Names

Submitting a Request

CRP Reports


         Previous  Next          Contents  Index  Navigation  Glossary  Library