Overview of Plan Generation in Supply Chain Planning

Multiorganization material requirements plans (MRP), master production schedules (MPS), and distribution requirements plans (DRP) explode through the bill of material to generate component requirements by evaluating:

It then calculates time-phased material requirements. Each item may have different attributes that affect the recommendations generated by the planning process.

Review Plan Generation for information on plan generation in Oracle Master Scheduling/MRP.

Specifying Items for the Supply Chain Planning Process

The items included the planning process depends on the planning method set for them (in their item attributes) and on whether you allow the planning process to include them. In Oracle Master Scheduling/MRP, you select the type of item subject to the planning process in the Planning Parameters window. In Oracle Supply Chain Planning, you make this selection in the Plan Options window.

You can include:

The planning process interprets these options differently, depending on the type of plan you choose to run. Table 1 - 48 compares the effect of the Planned Items option on an MPS, MRP, and a DRP:

Plan Option DRP includes... MPS includes... MRP includes...
       
Include all items All items in the planned organizations having an MRP planning code of: ·DRP planning ·MRP and DRP planning ·MPS and DRP planning MRP planned and MPS planned items that are in between the above items in the bill structure. All items in the input schedules. All items in the planned organizations having an MRP planning code of: ·MPS planning ·MPS and DRP planning MRP planned and MRP/DRP planned items that are in between the above items in the bill structure. All items in the input schedules. All items in the planned organizations except ones having MRP planning code of Not Planned.
Include demand schedule items only All items in the input demand schedules, and all components of these items that have an MRP planning code of: ·DRP planning ·MRP and DRP planning ·MPS and DRP planning MPS and MRP planned items that are in between the above items in the bill structure. All items in the input demand schedules, and all components of these items that have an MRP planning code of: ·MPS planning ·MPS and DRP planning All items in the input demand schedules, and all components of these items that have an MRP planning code of: ·MRP planning ·MRP and DRP planning
Include supply schedule items only All items in the input supply schedules, and all components of these items that have an MRP planning code: ·DRP planning ·MRP and DRP planning ·MPS and DRP planning MRP planned and MPS planned items that are in between the above items in the bill structure. All items in the input supply schedules, and all components of these items that have an MRP planning code of: ·MPS planning ·MPS and DRP planning All items in the input supply schedules, and all components of these items that have an MRP planning code of: ·MRP planning ·MRP and DRP planning
Include demand and supply schedule items only All items in the input demand and supply schedules, and all components of these items that have an MRP planning code of: ·DRP planning ·MRP and DRP planning ·MPS and DRP planning MRP planned and MPS planned items that are in between the above items in the bill structure. All items in the input demand and supply schedules, and all components of these items that have an MRP planning code of: ·DRP planning ·MRP and DRP planning ·MPS and DRP planning MRP planned and MPS planned items that are in between the above items in the bill structure. All items in the input demand and supply schedules, and all components of these items that have an MRP planning code of: ·MRP planning: ·MRP and DRP planning