Previous  Next          Contents  Index  Navigation  Glossary  Library

Verifying Control Totals and Control Counts

When you enter a Control Total or Control Count on the Expenditure Batch window, or enter a Control Total on the Expenditures window, Oracle Projects keeps track of the running total and running count of expenditures within a batch, and the running total for expenditure items associated with an expenditure. As you enter expenditure items, the system maintains a running total of each amount.

Oracle Projects verifies control totals and control counts when you submit a batch. If the running total or running count does not equal your control totals, the system does not let you submit the expenditure batch until your totals match. If you do not enter control totals, the system does not check that control totals match.


         Previous  Next          Contents  Index  Navigation  Glossary  Library