Your deployment requires the following items:
- Requires standard interactivity calendars
- Does not require new calendar features that the 2012 Innovation Pack introduces
|
Do not modify the repository. Siebel Open UI adds no new calendar features that the 2012 Innovation Pack introduces, such as the Event Style or Workweek features. All calendars work correctly:
- High interactivity calendars work in Siebel Open UI the same way that they work in the high-interactivity client while in high-interactivity mode.
- Standard interactivity calendars do not work in Siebel Open UI. They will continue to work in the same way that they previously worked in the high and standard interactivity clients.
- Siebel Open UI calendars work in Open UI mode.
|
Your deployment requires the following items:
- Requires Siebel Open UI Calendars
- Requires new features that the 2012 Innovation Pack introduces
- Does not require standard interactivity calendars
|
Import your Siebel Open UI modifications and a separate SIF file. This SIF file imports Siebel Open UI modifications and a separate file that updates standard interactivity calendars to use the new Open UI control. If the user runs the Siebel application in high interactivity or standard-interactivity mode, then Siebel Open UI does not render any standard interactivity calendar and it might create an error. Oracle includes this SIF file in a ZIP file in the Tools\RepPatch folder. For more information, see Siebel Maintenance Release Guide on My Oracle Support. |