Complete the following checklist to ensure that the systems component considerations have been addressed.
| System Components Checklist Items | Yes | No | N/A | Comment |
|---|---|---|---|---|
|
Is it an Exalogic machine full rack, Exalogic machine half rack, Exalogic machine quarter rack, or Exalogic machine eighth rack? |
||||
|
How many racks will be installed? |
||||
|
If more than one rack will be installed, then was the cable upgrade kit ordered? |
||||
|
Is the rack installation a new system or an addition to an existing system? |
||||
|
Is the system going to connect to another Exalogic machine? |
||||
|
Was the multirack cabling service purchased? |
||||
|
Are all Exalogic machine racks adjacent to each other? |
||||
|
If the connecting racks are not within the specified proximity, then have the following been done:
|
||||
|
Will the Ethernet switch be replaced? If yes, then have you arranged for the replacement switch installation? |