Sun Fire 6800/4810/4800/3800 Systems Site Planning Guide
805-7365-15
Contents |
1.3 Environmental Requirements
1.4 Facility Power Requirements
1.6 Planning Your Access Route
2.2 General Physical Guidelines
2.2.1 Size and Space Specifications
2.3 Planning Your Access Route
2.4 Network Connection Planning
2.4.1 Setup and Network Connections
2.4.2 Platform and Domain Setup Information
3. Environmental and Electrical Specifications
3.1 Environmental Requirements
3.1.1 Ambient Temperature Recommendations
3.1.2 Ambient Relative Humidity Recommendations
3.2 Facility Power Requirements
3.3 Electrical and Cooling Specifications
Copyright © 2004, Sun Microsystems, Inc. All rights reserved.