|
Figures |
FIGURE 2-1
Example of a Server Room Layout
FIGURE 2-2
Example Configuration 1: Three Chassis, No External SCSI Devices
FIGURE 2-3
Example Configuration 2: Three Chassis, Two External SCSI Devices
FIGURE 2-4
Physical Specifications for the Netra CT Chassis
FIGURE 2-5
Netra CT 810 Server Physical Specifications
FIGURE 2-6
Netra CT 410 Server Physical Specifications
FIGURE 2-7
Installing a Grounding Plate
FIGURE 2-8
Airflow, Netra CT 410 Server (Side View)
FIGURE 2-9
Airflow, Netra CT 810 Server (Side View)
FIGURE 3-1
Center-Mounting the Chassis
FIGURE 3-2
Installing the Mounting Bracket Adapters
FIGURE 3-3
Loosening the Screws at the Top of a Netra CT 810 Server
FIGURE 3-4
Loosening the Screws at the Top of a Netra CT 410 Server
FIGURE 3-5
Loosening the Screws at the Bottom of a Netra CT 810 Server
FIGURE 3-6
Loosening the Screws at the Bottom of a Netra CT 410 Server
FIGURE 3-7
Removing a Netra CT 810 Server From the Chassis
FIGURE 3-8
Removing a Netra CT 410 Server From the Chassis
FIGURE 3-9
Mounting the Netra CT Chassis in a Rack
FIGURE 3-10
DC Grounding Studs
FIGURE 4-1
Unpacking a Netra CT Server
FIGURE 4-2
Installing a Netra CT 810 Server in the Chassis
FIGURE 4-3
Installing a Netra CT 410 Server in the Chassis
FIGURE 4-4
Tightening the Screws at the Top of a Netra CT 810 Server
FIGURE 4-5
Tightening the Screws at the Top of a Netra CT 410 Server
FIGURE 4-6
Tightening the Screws at the Bottom of a Netra CT 810 Server
FIGURE 4-7
Tightening the Screws at the Bottom of a Netra CT 410 Server
FIGURE 5-1
Attaching the Antistatic Wrist Strap
FIGURE 5-2
Supported Locations for RTM Sets in a Netra CT 810 Server (Top View)
FIGURE 5-3
Supported Locations for RTM Sets in a Netra CT 410 Server (Top View)
FIGURE 5-4
Supported and Unsupported Netra CP2140 Host CPU RTM for a Netra CT Server
FIGURE 5-5
Supported Netra CP2500 Host RTM for a Netra CT Server
FIGURE 5-6
Aligning the Board With the Rear Board Cage Cutouts
FIGURE 6-1
Installing the Cable Management Brackets
FIGURE 6-2
Host CPU RTM in a Netra CT 810 Server (Top View)
FIGURE 6-3
Host CPU RTM in a Netra CT 410 Server (Top View)
FIGURE 6-4
Connectors on the Netra CP2140 host RTM
FIGURE 6-5
Supported Netra CP2500 Host RTM
FIGURE 6-6
RJ-45 Ethernet Connector Diagram
FIGURE 6-7
Supported Location for the Alarm RTM in a Netra CT 810 Server (Top View)
FIGURE 6-8
Supported Location for the Alarm RTM in a Netra CT 410 Server (Top View)
FIGURE 6-9
Connectors on the Alarm RTM
FIGURE 6-10
RJ-45 Ethernet Connector Diagram
FIGURE 6-11
COM Ports 1 and 2
FIGURE 6-12
Alarm Port
FIGURE 6-13
Connection Parts
FIGURE 6-14
Stripping the Insulation From the Wire
FIGURE 6-15
Opening the Input Plug Cage Clamp Using the Cage Clamp Operating Lever
FIGURE 6-16
Opening the Cage Clamp Using a Screwdriver
FIGURE 6-17
Assembling the Input Power Cable
FIGURE 6-18
Inserting the Bottom Portion of the Strain Relief Housing
FIGURE 6-19
Routing the Wires Out of the Bottom Portion of the Strain Relief Housing
FIGURE 6-20
Securing the Wires to the Strain Relief Housing
FIGURE 6-21
Assembling the Strain Relief Housing
FIGURE 6-22
Locating the Connectors
FIGURE 6-23
Connecting the Input Power Cable to the Connectors
FIGURE 6-24
Disconnecting the Input Power Cable From the Connector
FIGURE 7-1
Locating the Power Supply Locking Mechanism on the Netra CT 810 Server
FIGURE 7-2
System Status Panel Locations
FIGURE 7-3
System Power Button and System Power LED Locations (Netra CT 810 Server)
FIGURE 7-4
System Power Button and System Power LED Locations (Netra CT 410 Server)
FIGURE A-1
SCSI Connector on the Netra CP2140 Host RTM
Copyright © 2007, Sun Microsystems, Inc. All Rights Reserved.