C H A P T E R 1 |
Installation Overview |
This chapter provides an overview of the tasks necessary to install a Netra CT server. Detailed instructions for each task are provided on the pages specified.
Prepare your site for installation by checking the room and rack spacing, and the power source. |
|
Install optional boards, such as satellite CPU or I/O boards. |
|
Connect the cables to the host CPU board and a host rear transition module. |
To Connect Cables to Host Rear Transition Modules (host CPU RTM) |
Connect the cables to the alarm card or to the alarm rear transition module. |
To Connect Cables to Alarm Rear Transition Module (alarm RTM) |
To Connect Cables to Satellite or I/O Rear Transition Modules (I/O boards) |
|
Copyright © 2007, Sun Microsystems, Inc. All Rights Reserved.