Figures |
FIGURE 2-1 Example of a Server Room Layout
FIGURE 2-2 Example Configuration 1: Three Chassis, No External SCSI Devices
FIGURE 2-3 Example Configuration 2: Three Chassis, Two External SCSI Devices
FIGURE 2-4 Physical Specifications for the Netra CT Chassis
FIGURE 2-5 Netra CT 810 Server Physical Specifications
FIGURE 2-6 Netra CT 410 Server Physical Specifications
FIGURE 2-7 Installing a Grounding Plate
FIGURE 2-8 Airflow, Netra CT 410 Server (Side View)
FIGURE 2-9 Airflow, Netra CT 810 Server (Side View)
FIGURE 3-1 Center-Mounting the Chassis
FIGURE 3-2 Installing the Mounting Bracket Adapters
FIGURE 3-3 Loosening the Screws at the Top of a Netra CT 810 Server
FIGURE 3-4 Loosening the Screws at the Top of a Netra CT 410 Server
FIGURE 3-5 Loosening the Screws at the Bottom of a Netra CT 810 Server
FIGURE 3-6 Loosening the Screws at the Bottom of a Netra CT 410 Server
FIGURE 3-7 Removing a Netra CT 810 Server From the Chassis
FIGURE 3-8 Removing a Netra CT 410 Server From the Chassis
FIGURE 3-9 Mounting the Netra CT Chassis in a Rack
FIGURE 3-10 DC Grounding Studs
FIGURE 4-1 Unpacking a Netra CT Server
FIGURE 4-2 Installing a Netra CT 810 Server in the Chassis
FIGURE 4-3 Installing a Netra CT 410 Server in the Chassis
FIGURE 4-4 Tightening the Screws at the Top of a Netra CT 810 Server
FIGURE 4-5 Tightening the Screws at the Top of a Netra CT 410 Server
FIGURE 4-6 Tightening the Screws at the Bottom of a Netra CT 810 Server
FIGURE 4-7 Tightening the Screws at the Bottom of a Netra CT 410 Server
FIGURE 5-1 Attaching the Antistatic Wrist Strap
FIGURE 5-2 Supported Locations for RTM Sets in a Netra CT 810 Server (Top View)
FIGURE 5-3 Supported Locations for RTM Sets in a Netra CT 410 Server (Top View)
FIGURE 5-4 Supported and Unsupported Netra CP2140 Host CPU RTM for a Netra CT Server
FIGURE 5-5 Supported Netra CP2500 Host RTM for a Netra CT Server
FIGURE 5-6 Aligning the Board With the Rear Board Cage Cutouts
FIGURE 6-1 Installing the Cable Management Brackets
FIGURE 6-2 Host CPU RTM in a Netra CT 810 Server (Top View)
FIGURE 6-3 Host CPU RTM in a Netra CT 410 Server (Top View)
FIGURE 6-4 Connectors on the Netra CP2140 host RTM
FIGURE 6-5 Supported Netra CP2500 Host RTM
FIGURE 6-6 RJ-45 Ethernet Connector Diagram
FIGURE 6-7 Supported Location for the Alarm RTM in a Netra CT 810 Server (Top View)
FIGURE 6-8 Supported Location for the Alarm RTM in a Netra CT 410 Server (Top View)
FIGURE 6-9 Connectors on the Alarm RTM
FIGURE 6-10 RJ-45 Ethernet Connector Diagram
FIGURE 6-11 COM Ports 1 and 2
FIGURE 6-12 Alarm Port
FIGURE 6-13 Connection Parts
FIGURE 6-14 Stripping the Insulation From the Wire
FIGURE 6-15 Opening the Input Plug Cage Clamp Using the Cage Clamp Operating Lever
FIGURE 6-16 Opening the Cage Clamp Using a Screwdriver
FIGURE 6-17 Assembling the Input Power Cable
FIGURE 6-18 Inserting the Bottom Portion of the Strain Relief Housing
FIGURE 6-19 Routing the Wires Out of the Bottom Portion of the Strain Relief Housing
FIGURE 6-20 Securing the Wires to the Strain Relief Housing
FIGURE 6-21 Assembling the Strain Relief Housing
FIGURE 6-22 Locating the Connectors
FIGURE 6-23 Connecting the Input Power Cable to the Connectors
FIGURE 6-24 Disconnecting the Input Power Cable From the Connector
FIGURE 7-1 Locating the Power Supply Locking Mechanism on the Netra CT 810 Server
FIGURE 7-2 System Status Panel Locations
FIGURE 7-3 System Power Button and System Power LED Locations (Netra CT 810 Server)
FIGURE 7-4 System Power Button and System Power LED Locations (Netra CT 410 Server)
FIGURE A-1 SCSI Connector on the Netra CP2140 Host RTM
Copyright © 2007, Sun Microsystems, Inc. All Rights Reserved.