This appendix provides a task list and a data sheet that you could use to create, run and monitor a project that uses the HIPAA PM.
This is list of all the tasks that needs to be performed to create, run and monitor a project.
Prerequisite setup tasks:
Ensure external systems are installed and available.
Install the product .sar files (if not already done)
Create and start logical host domains (if not already done)
Download and run Oracle scripts (if not already done)
Enterprise Designer tasks:
Create (or import) environments, and then configure them
Create and build B2B Host projects
Start logical hosts (if not already done)
Build and deploy GUI and Error projects
Create validation Connectivity Map, and then build and deploy eXchange deployment
Customize sample project components, and then build and deploy samples
ePM tasks:
Start ePM
Import (or create) hosts and TPs
Configure or customize hosts and TPs as needed
Run-time tasks:
Feed input data (i.e., run the projects)
Verify output data
Track messages
Fill in the data sheet and use the completed data sheet when you start working on the project.
Table A–1 Configuration Parameters for Oracle Database and Connections
Parameter |
Value |
---|---|
Server Name: | |
Port Number: | |
Database Name: | |
User: | |
Password: |
Table A–2 Configuration Parameters for LDAP Connection
Server Name: | |
User ID: | |
Password: | |
Port Number: | |
Base DN: | |
Provider URL: |
Table A–3 Port Numbers
Repository | |
Enterprise Manager | |
Integration Server | |
IQ Manager |
Table A–4 Paths and Filenames of Data Files That Are Read
Path | |
Filenames | |
Table A–5 Paths and Filenames of Data Files That Are Written
Path | |
Filenames | |