To create and enable TPs you can do the following operations using ePM:
For complete information on how to do these operations in ePM, see the eXchange Integrator User’s Guide. Also, Run-time Steps contains a sample scenario with specific examples of TPs set up in ePM.
The following sections provide basic instructions on how to use ePM:
The rest of this section provides a general summary of how to access ePM, as well as use it with TPs for ebXML Protocol Manager Projects.