Before installing or servicing the switch, you must prepare the following:
The environment where the switch is to be installed must conform to the requirements found in Environmental Requirements.
The rack to receive the switch must have proper power, management, and InfiniBand fabric cabling brought to it.
The rack must have an available location for the switch.
There must be a clean, dry, stable work surface.