Exit Print View

Sun Datacenter InfiniBand Switch 72 User’s Guide

Get PDF Book Print View
 

Document Information

Using This Documentation

Related Documentation

Documentation, Support, and Training

Documentation Feedback

Installing the Switch

Understanding Switch Specifications

Routing Service Cables

Understanding InfiniBand Cabling

Understanding the Installation

Shipping Carton Contents

Install the Switch in the Rack

Powering On the Switch

Connecting InfiniBand Cables

Verifying the InfiniBand Fabric

Administering the Switch

Troubleshooting the Switch

Administrative Command Overview

Monitoring the Hardware

Monitoring the InfiniBand Fabric

Controlling the Hardware

Controlling the InfiniBand Fabric

Servicing the Switch

Understanding Service Procedures

Servicing the Power Supplies

Servicing the Fans

Servicing the InfiniBand Cables

Inspecting an InfiniBand Cable

Identify the InfiniBand Cable

Inspect the InfiniBand Cable Hardware

Inspect the InfiniBand Cable Connectors

Remove an InfiniBand Cable

Install an InfiniBand Cable

Servicing the Battery

Upgrading the Firmware

Index

Inspect the InfiniBand Cable Connectors

  1. Identify the prerequisite and subsequent service tasks you must perform in conjunction with this procedure.

    See Inspecting an InfiniBand Cable.

  2. Verify that the shell is not bent and is parallel to the inner boards.

  3. Verify that there are no contaminants inside of the connector.

  4. Verify that the retractor strap adequately operates the hooks.

  5. The cable is ready for installation.

    See Install an InfiniBand Cable.

Related Information